The buildings, design and specification programme focuses on the latest design and specification trends as well as technical and product innovation projects.

Latest

Cost model

Shell ETC highres 37 kopie 2 (1) copy

Cost model: What solutions are there for low embodied carbon office fit-outs?

2024-12-02T07:04:00+00:00By Lauren Lemcke, Danielle Rowley and Dave Cheshire

Office fit-outs score poorly on whole-life emissions, because short tenancies lead to repeated refitting.聽Aecom鈥檚 Lauren Lemcke, Danielle Rowley and Dave Cheshire report on new solutions

Webinars and events

CPD

  • CPD 20 2024: Steel structures for fire performance

  • CPD 19 2024: Specifying glass in rooflights

  • CPD 18 2024: Carbon negative brick solutions

  • CPD 17 2024: Flat roofs and fire testing standards

  • CPD 16 2024: Embedding excellence in carbon management

  • CPD 15 2024: Digital workflow technology

  • CPD 14 2024: Engaging BIM to build a more connected built environment

  • CPD 13 2024: When a warranty comes into play

  • CPD 12 2024: Future-proofing balcony and terrace flooring

  • CPD 11 2024: Thermal regulation and the performance gap

All our latest content

Undershaft top 2024 2

News

Stanhope鈥檚 revised 1 Undershaft tower set for approval this Friday

By

Planning officers back amended Eric Parry scheme despite Historic England saying it is 鈥榓rguably worse鈥 than previous proposal

130 Fenchurch ground floor

News

Developer reveals plans for 31-storey City tower designed by Wilkinson Eyre

By

CO-RE鈥檚 for Aviva Investors to replace 1950s tower on the edge of the City鈥檚 eastern cluster

Ben-Flatman-photo-cropped

Comment

Heritage, sustainability and dysfunction: the lessons of the M&S decision

By

The drawn-out battle over Marks & Spencer鈥檚 Oxford Street redevelopment reflects systemic failures at the heart of the UK鈥檚 planning system

Sanctuary Low-res

News

Sellar鈥檚 36-storey City tower gets planning nod

By

Councillors vote to back 3XN-designed 60 Gracechurch scheme as Barbican upgrade gets near 拢200m funding boost

Farrells Battersea dec 1

News

Farrells reduces height of planned Battersea tower by five storeys as 1,500 objections hit scheme

By

Second height reduction takes scheme down to 28 storeys and removes 60 homes compared to original proposal

Pilbrow and Partners_Marks Spencer Marble Arch - Vision

News

Rayner backs M&S鈥檚 Oxford Street plan to demolish flagship store

By

Move means communities secretary has overturned predecessor Michael Gove鈥檚 decision to block proposal last summer

ROCKWOOL-TECH-MARKETING-PR-185 (6)

Sponsored

Why insulation choice isn鈥檛 just about U-value

Sponsored by

James Francis, Product Manager at ROCKWOOL UK, explains why specifiers need to look beyond a single metric when choosing insulation

Shell ETC highres 37 kopie 2 (1) copy

Features

Cost model: What solutions are there for low embodied carbon office fit-outs?

By Lauren Lemcke, Danielle Rowley and Dave Cheshire

Office fit-outs score poorly on whole-life emissions, because short tenancies lead to repeated refitting.聽Aecom鈥檚 Lauren Lemcke, Danielle Rowley and Dave Cheshire report on new solutions

St_Leonards_Quarter_Exeter18

Sponsored

The role of manufacturers in delivering low carbon projects

Sponsored by

As the demand for measurable, data-led reporting on carbon emissions increases across the construction industry, the need for manufacturers to improve their transparency, accountability, and specification support also increases

60 Gracechurch May 7

News

Sellar鈥檚 36-storey City tower set for approval next week

By

But Tenacity鈥檚 neighbouring 55 Gracechurch scheme in doubt as planning consent expires

lloyds building

Features

From the archives: Trouble at the Lloyd鈥檚 building, 1986

By

黑洞社区 reports mixed reactions from occupants and doubts about the building鈥檚 future prospects in a piece published shortly after the opening of the Richard Rogers-designed landmark

BGY - Sclater Street - Mission Chapel - RESIZED

News

Bishopsgate Goodsyard resurfaces as developers eye 2025 construction start

By

Green light for Gensler and Buckley Gray Yeoman-designed office tower on site with more approvals expected in coming months

99 Bishopsgate sept 4

News

Historic England calls for RSHP鈥檚 99 Bishopsgate to be refused over heritage fears

By

Government advisor tells City to throw out Brookfield鈥檚 54-storey tower submitted in September

Bury House 2

News

Rayner puts plans for 43-storey City tower on ice

By

Stiff & Trevillion鈥檚 Bury House scheme has amassed more than 1,300 objections due to impact on neighbouring grade I-listed Bevis Marks Synagogue

Undershaft top 2023

News

Stanhope鈥檚 revised 1 Undershaft plans criticised by neighbouring occupiers

By

Security measures for proposed seven-metre high digital screen would create 鈥渆nvironment of surveillance鈥, pension scheme says

Glazing shutterstock image

Information - 黑洞社区

CPD 19 2024: Specifying glass in rooflights

Sponsored by

Sponsored by Glazing Vision, this module will explore the relevant industry guidance and technical considerations when specifying glass in rooflights, guiding professionals through the design, manufacturing and construction process.

washwood

News

Decision on winner of last major building job on HS2 slips into next year

By

拢480m Washwood Heath announcement now expected next spring more than five years after project was first advertised

Make 48 Chiswell 1

News

Make鈥檚 City fringe office overhaul deferred over height policy breach

By

Councillors said scheme鈥檚 鈥渢enuous鈥 community benefits did not justify proposed two-storey roof extension

IMG_6225

Features

Elevating security standards in commercial student accommodation

Sponsored by , By

Purpose-built student housing up and down the country continues to magnetise crime. At a roundtable hosted by 黑洞社区 in partnership with Jeld-Wen, experts shared their insights into how risk can be managed now and in the future

Nicholas Boys Smith c. Tom Campbell

News

Decision to scrap government design advisor Office for Place a 鈥榤istake鈥, says Nicholas Boys Smith

By

Body鈥檚 interim chair said move risks ministers 鈥渕arking their own homework鈥 on housing design

Acme Liverpool St 4

News

Network Rail unveils 鈥榗ompletely reimagined鈥 plan for Liverpool Street station redevelopment

By

Sellar no longer working on scheme with Herzog & De Meuron replaced by Acme

Living Tomorrow Campus 1

Information - 黑洞社区

CPD 18 2024: Carbon negative brick solutions

Sponsored by

Sponsored by Vandersanden, this module will explore the specification of carbon negative bricks, a recent innovation developed to offer a more sustainable alternative to clay brick in terms of carbon sequestration.

Tenter House 3

News

Stalled 拢200m office scheme passes another hurdle as City grants planning approval

By

Tenter House scheme finally on verge of construction after 27-year development saga

Wrexham fans_Credit_Gemma Thomas_Wrexham AFC

News

Populous replaces AFL Architects on Wrexham stadium upgrade

By

Plans for new 5,500-seat Kop stand back on track with practice also appointed to draw up wider masterplan for site

Tenter House 3

News

Progress for 拢200m City office stalled for three decades as planners recommend approval

By

Lendlease, Mace and McLaren bidding for 21-storey Tenter House job

Undershaft Oct 4

News

Eric Parry cuts back footprint of 1 Undershaft tower ahead of second planning hearing

By

Revisions unveiled after decision on scheme was deferred due to concerns around loss of public space

SW_Rose Yard Event

News

KPF submits huge City fringe redevelopment

By

Scheme would contain 65,000sq m of office space on site currently occupied by 30 separate buildings

IMG_5190

Features

The challenges and opportunities of data centre delivery

Sponsored by

Senior industry professionals gathered to share their diverse perspectives on the rapidly changing world of data centres and the dynamic growth of this construction sub-sector, at a roundtable hosted by Jubb and 黑洞社区 magazine

Original Picture in PNG-DSC00266

Information - 黑洞社区

CPD 17 2024: Flat roofs and fire testing standards

Sponsored by

Sponsored by Soprema, this CPD module delves into the rise of flat roofs, their聽evolving nature, and the crucial fire testing standards that must be met in order聽to achieve compliance with current building regulations

Midland Met exterior front 漏 Paul Raftery

Features

Picking up Carillion鈥檚 pieces: how Balfour Beatty finally finished the Midland Metropolitan University Hospital

By

West Birmingham鈥檚 new super hospital has just opened, six years later than planned following the failure of Carillion in 2018. Thomas Lane visits the new building to find out how the team overcame multiple problems, and to see what the finished project is like

Index pic for NYC roundtable 6

In partnership

What more can investors and regulators do to help project teams decarbonise buildings?

Sponsored by , By Jordan Marshall and Chlo毛 McCulloch

As part of last month鈥檚 Climate Week NYC, 黑洞社区 hosted a roundtable with the support of Gleeds and in partnership with the Climate Group. Our discussion with leading construction experts identified the blockers to greener buildings and key drivers for change

BSI CPD image 4

Information - 黑洞社区

CPD 16 2024: Embedding excellence in carbon management

Sponsored by

Sponsored by BSI, this module will explore PAS 2080 and how the standard鈥檚 requirements enable professionals to embed carbon management excellence throughout the built environment supply chain

AHMM Fairchild 6

News

Green light for AHMM鈥檚 27-storey City fringe office tower

By

Progress for Shoreditch site which has been vacant and hoarded for five years

Whitworth St 2

News

Sheppard Robson unveils plans for 44-storey Manchester tower

By

Latest addition to city鈥檚 high-rise cluster would include 364 homes

shutterstock_2502153963

Features

Procurement update: data centre development challenges

By James聽Halse and Simon Rawlinson

Data centre clients are scaling up to deliver ever bigger programmes 鈥 so, what are the main client types and the specific procurement challenges in this sector?

shutterstock_773658739

Features

Market forecast: Demand is set to rise as the economy stabilises

By Brian Smith

Demand is set to strengthen as economic stability stimulates a recovery in private sector investment, but contractor capacity is depleted and risk aversion elevated

RENSON_Windesheim academie Zwolle

Features

Technical ventilation louvres for any project

Sponsored by

Family-owned business Renson develops wall, surface-mounted, window, door, and floor louvres, in every possible size, shape, and colour

Mark Farmer new 2020

Comment

Here we go again鈥 if the industry won鈥檛 change, we must change the way we operate within it

By

The collapse of ISG is the latest illustration of a trading model still stuck in聽鈥榠nexorable decline鈥. The industry鈥檚 survival requires wise leadership, better decision-making and a focus on what is working rather than what is not,聽says Mark Farmer

London_AELTC Wimbledon Park

News

Relief for Wimbledon as City Hall overturns local council鈥檚 rejection of 拢200m expansion plans

By

Allies & Morrison鈥檚 plans to treble the size of grand slam tournament鈥檚 grounds finally approved after year-long planning saga

Topcon CPD image 2

Information - 黑洞社区

CPD 15 2024: Digital workflow technology

Sponsored by

Sponsored by Topcon Positioning GB, this module will explore the benefits of digital workflow technology, alongside the issues that may arise during integration and how they can be overcome

Part 3

Features

Navigating specification decisions in higher-risk building design

Sponsored by

Specification decisions have acquired new complexity in the era of the 黑洞社区 Safety Act. Industry professionals shard their insights at a roundtable

shutterstock_693903967

News

Fosters to lead on Old Trafford masterplan for Manchester United

By

Project will draw up proposals for club-owned land around stadium

shutterstock_2413128659

Features

London towers 鈥 does it make more sense to build new or renew?

By Turner & Townsend Alinea

The twin currencies of carbon and cost have encouraged the adaptive reuse of towers, bringing the additional complexity of working within an existing building

Hawkins Brown Cam 6

News

Hawkins Brown plans for 拢100m Cambridge research campus set for approval

By

Scheme to include nine buildings up to eight storeys in height

Hinkley aerial shot

Features

Hinkley Point C: 黑洞社区 Britain鈥檚 first nuclear reactor in 30 years

By

Like its Finnish and French twins, Hinkley Point C has suffered from cost overuns and delays. What are the team doing to claw back the losses and what does this mean for Sizewell C?

Undershaft top 2024

News

Revised 1 Undershaft plans to be submitted in coming weeks but controversial viewing platform to stay

By

Changes relate almost entirely to street level public realm after plans were criticsed for 鈥渞obbing鈥 City of open space

garden

News

Fosters unveils restoration of San Francisco鈥檚 Transamerica Pyramid

By

The architect remodelled the lobby and garden of the centre鈥檚 48-storey skyscraper

Costing steelwork cover 29

Features

Costing Steelwork 29: Market update and guidance on fire regulations

Sponsored by

A market update from Aecom, BCSA and Steel for Life

Peter Caplehorn 1

Comment

European CE mark extension gives UK manufacturers the chance to remain competitive

By

The recent extension to the UK鈥檚 acceptance of the European CE mark offers an overdue opportunity to drive the construction products industry towards increased safety, performance and trade, says Peter Caplehorn of the Construction Products Association

BSI CPD image 1

Information - 黑洞社区

CPD 14 2024: Engaging BIM to build a more connected built environment

Sponsored by

Sponsored by BSI, this module will guide professionals looking to improve their BIM knowledge, as well as assist seasoned users wanting to enhance digital security or understand the higher-level benefits of BIM adopti

Fire safety inspector shutterstock

News

Government commits to 鈥榮ystem-wide鈥 construction products reform as CE marking deadline is extended again

By and

Package of building safety measures include scrapping national fire testing standards and mandating sprinklers in care homes

LABC warranty CPD header 1

Information - 黑洞社区

CPD 13 2024: When a warranty comes into play

Sponsored by

There is often confusion surrounding the relationship between warranties, building control and other insurances, making it difficult to know what is needed and when. Sponsored by LABC Warranty, this module will explore when a warranty comes into play, alongside the implications of housing defects left unchecked

Balcony and terrace shutterstock image

Information - 黑洞社区

CPD 12 2024: Future-proofing balcony and terrace flooring

Sponsored by

Sponsored by Ryno, this module takes a deep dive into balcony and terrace flooring, looking at the regulations and standards which govern design, alongside the common challenges and best practices

Fountain House

News

Aviva planning to nearly double the height of its planned City tower

By

Investor hoping to build up to 32 storeys on 130 Fenchurch street under plans being drawn up by Wilkinson Eyre

18 Blackfriars Rd

Features

Cost model: Evaluating the construction cost impact of the 黑洞社区 Safety Act

By James Barton and Edward Steiger

The implications of the legislation, a look at real-world applications, and a notional model for cost increases on a higher-risk building

Rockwool CPD 1

Information - 黑洞社区

CPD 11 2024: Thermal regulation and the performance gap

Sponsored by

Sponsored by Rockwool, this CPD module examines the regulations and considerations聽relating to a building鈥檚 thermal performance and the role that stone wool insulation can聽play in ensuring that the as-built performance of buildings is as intended

Overheating CPD by Zehnder

Information - 黑洞社区

CPD 10 2024: Understanding overheating in homes

Sponsored by

This module 鈥 sponsored by indoor climate specialists Zehnder Group UK 鈥 will explore the factors that contribute to overheating in residential projects alongside the relevant regulations and ventilation solutions that can help combat rising temperatures

3XN Gracechurch Aug 5

News

New pictures of Sellar鈥檚 36-storey City tower revealed as plans are submitted

By

Practice outlines design development of 拢500m 60 Gracechurch scheme

Sponsors

  • Platinum sponsor: Rockwool

Upcoming events

18 September 2024:

18 September 2024: 黑洞社区 the Future Conference, BA & AYA Shortlisting Party

16 October 2024:

22 October 2024:

5 November 2024:

20-21 November 2024:

5 December 2024: