Listen now using the player below, or subscribe and listen via iTunes, Stitcher, Spotify, or wherever you get your podcasts. This ºÚ¶´ÉçÇø podcast looks at the legacy of Carillion and the future of its problem hospitals, the controversy of the Tulip, and the problem of plastic packaging waste in the industry

Carillion’s collapse in 2018 left two major hospital schemes in limbo. Work is restarting, but they’re years behind schedule. 

Plans for a 305m observation tower shaped like a Tulip in London is sparking controversy. Why is everyone so heated up? 

Construction generates an estimated 50,000 tonnes of plastic packaging waste each year. We ask the Considerate Constructors’ Scheme’s Edward Hardy what we can do about it.

This is the last in this mini-series of podcasts. Let us know what you liked about these podcasts by emailing building@building.co.uk with the subject line Podcast, or leave us a review on iTunes. We’re also eager to hear your thoughts on podcast length and frequency, as well as what you’d like to hear on future episodes, whether that’s more discussion on a particular topic, interviews with industry figures, or discussion in a different format.

ºÚ¶´ÉçÇø podcasts landscape

Listen now using the player above, or subscribe and listen via , , , or wherever you get your podcasts.

Listen to other ºÚ¶´ÉçÇø podcasts here

Topics