Internal Treasury opposition to the scheme grows

High Speed Train

Treasury civil servants are privately warning the cost of High Speed 2 will hit 拢73bn, the Financial Times reports today.

The figure is more than 70% higher than the government鈥檚 official budget for the scheme of 拢42.6bn, which itself was increased by nearly 拢10bn in June.

The Treasury is privately ramping up its criticism of the scheme, the FT reports.

The 拢73bn figure includes the effect of inflation and VAT over the project鈥檚 20-year lifespan.

George Osborne is reportedly committed to the 225mph rail link between London and Birmingham, Leeds and Manchester to spread growth across the country.

The Institute of Economic Afffairs recently concluded that the total cost of HS2 would be even higher at 拢80bn, when the price of the trains and other additional projects stimulated by the construction of the line were included.