- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÚ¶´ÉçÇø the Future
- Data
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to date
- ºÚ¶´ÉçÇø Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to dateIndicative costs for developer’s category A fit-out | ||
Ìý | City/West End offices £/m2 (nifa) | Out-of-town offices £/m2 (nifa) |
Emulsion paint to core walls | 1-2 | 1-2 |
Medium grade raised access floor | 32-35 | 24-32 |
Carpet tiles | 22-26 | 16-20 |
Concealed grid metal tile ceiling | 35-40 | n/a |
Exposed grid mineral tiles ceiling | n/a | 22-27 |
Statutory signage | 1-2 | 1-2 |
Blinds | 3-5 | n/a |
4 pipe fan coil air conditioning | 130-140 | 95-115 |
Lighting (incl emergency lighting) | 36-40 | 32-35 |
Power to a/c boxes, floor boxes, earthing | 22-25 | 20-23 |
Fire alarms | 6-8 | 4-7 |
Sprinklers | 16-20 | n/a |
Controls | 17-20 | 10-14 |
Builder's work in connection with services | 9-12 | 5-8 |
Sub-total | 330-375 | 230-285 |
Add for Preliminaries (8%) & Contingency (5%), say | 45-50 | n/a |
Add for Preliminaries (5%) & Contingency (5%), say | n/a | 30-40 |
Total (£/m²) | 375-425 | 260-325 |
Total (£/ft²) | 35-39 | 24-30 |
Rates are at March 2003 price levels based on City of London and South-east locations respectively based on net internal floor areas. The rates include preliminaries allowances for a lump-sum contract and exclude professional fees and VAT. |
Indicative fit-out costs by sector | |
Business sector | Fit-out £/m2 |
Legal (London) | 550-800 |
Legal (regional city) | 400-550 |
Banks (London) | 600-900 |
Corporate (London) | 500-1200+ |
Corporate (out of town) | 450-900+ |
Government department /public agency (London) | 550-750 |
Costs are at March 2003 price levels based on City of London locations and South-east locations (regional city and out-of-town). Costs include preliminaries for a lump-sum contract, and exclude furniture, IT equipment, professional fees, relocation costs and VAT. |
Indicative Costs for fit-out of office space from shell-and-core condition | ||
Ìý | City/West End offices £/m2 (nifa) | Out-of-town offices£/m2 (nifa) |
developers’ fit-out to general office areas | 375-425 | 260-325 |
general office space – open plan | 425-600 | 285-400 |
general office space – part cellular | 525-800 | 350-550 |
senior executive offices | 600-900 | – |
conference suites | 1,100-1,500 | – |
showers and changing rooms | 1,100-1,350 | 850-1,100 |
training rooms | 500-650 | 400-550 |
main IT equipment rooms (24-hour cooling) | 3,000-6,500 | 2,500-6,000 |
subequipment rooms | 1,500-1,900 | 1,200-1,700 |
post rooms | 900-1,250 | 650-1000 |
vending/break-out areas | 1,000-1,200 | 800-950 |
meeting rooms | 600-850 | 500-750 |
back of house/storage | 450-650 | 280-400 |
staff restaurant | 1,150-1,950 | – |
kitchen (including catering equipment) | 2,100-2,600 | – |
Costs are at March 2003 price levels based on City of London locations and South-east locations (out-of-town) and include preliminaries allowances for a lump-sum contract.. | ||
Costs of furniture, IT wiring and equipment, professional fees, relocation costs and VAT are excluded. | ||
The costs of the restaurant includes servery fittings, and the kitchen includes costs of catering equipment. The cost of the computer suite excludes allowances for standby generation and uninterrupted power supply installations. |
Percentage costs of prelims in varying procurement routes | |
Procurement route | Preliminaries and contractor’s fee |
Single-stage, fixed lump sum | 6-10% |
Two-stage, fixed lump sum | 5-8% |
Negotiated, fixed lump sum | 8-12% |
Management contracting | 8-12% |
Construction management | 10-15% |
The percentages in the table are calculated on the assumption that the contractor will recover a further 2.5% discount built into subcontractors’ tenders. |
Indicative rates for office fit-out components | ||
Ìý | Unit | Price range £ |
Partitions (all 2.7-2.8 m high) | Ìý | Ìý |
Metal stud partitions | Ìý | Ìý |
one layer of plasterboard both sides | m | 90-120 |
two layers of plasterboard both sides + cavity insulation | m | 120-170 |
two layers of high density board both sides + cavity insulation | m | 190-220 |
– extra for curved work | m | 90-120 |
Demountable partitions | Ìý | Ìý |
Frame with plasterboard | m | 190-220 |
Frame and hung panel system | m | 200-220 |
– extra for part-glazed panel | m | 150-210 |
Fully demountable monobloc partitions | Ìý | Ìý |
Solid wall | m | 220-350 |
Single-glazed office front | m | 250-350 |
Double-glazed office front, interstitial blinds | m | 480-640 |
Glazed partitions | Ìý | Ìý |
Purpose made timber framed double glazed partition | m | 660-720 |
Frameless glazing, silicone joints | m | 450-700 |
Fire rated screen, 30/30, single glazed | m | 850-1,000 |
Storage walls | Ìý | Ìý |
500-600 deep full height integrated storage units | Ìý | Ìý |
– laminate faced chipboard | m | 950-1150 |
– stove enamelled mild steel | m | 150-1350 |
Sliding folding partitions | Ìý | Ìý |
Top hung sliding folding partition with particle board panels | Ìý | Ìý |
– vinyl finish | m | 1250-1750 |
– hardwood veneered | m | 2000-2500 |
Internal doors | Ìý | Ìý |
Doorsets complete with frames and ironmongery | Ìý | Ìý |
Painted ply-faced solid core door, softwood frame and aluminium | Ìý | Ìý |
or nylon ironmongery, 810, 910 or 1010 × 2050-2110 mm overall | Ìý | Ìý |
– one-hour fire rating | each | 450-550 |
– two-hour fire rating | each | 500-650 |
Hardwood veneered solid core door, hardwood frame and stainless | Ìý | Ìý |
steel ironmongery, 810, 910 or 1010 × 2050-2110 mm overall | each | 850-1300 |
Extra for full height doors | each | 20-25% |
Extra for standard height doors with matching overpanels | each | 20-25% |
Extra for vision panels | Ìý | Ìý |
– non fire rated | each | 80-100 |
– half-hour fire rating | each | 100-150 |
Wall finishes | Ìý | Ìý |
Panelling | Ìý | Ìý |
Timber panelling | m2 | 340-390 |
Fabric-covered framed panelling | m2 | 240+ |
Acoustic panelling | m2 | 380+ |
Stone cladding | Ìý | Ìý |
Marble cladding | m2 | 215-270 |
Limestone cladding | m2 | 340-500 |
Granite cladding | m2 | 340-560 |
Applied finishes | Ìý | Ìý |
Plaster and emulsion | m2 | 14-18 |
Vinyl wall coverings | m2 | 12-20 |
High-quality vinyl wall covering | m2 | 22-32 |
Fabric wall covering | m2 | 22-48 |
Polished plaster | m2 | 110-135 |
Floor finishes | Ìý | Ìý |
Raised floors | Ìý | Ìý |
Medium duty 150 mm cavity | m2 | 30-40 |
Medium duty 300-450 mm cavity | m2 | 35-50 |
Heavy duty, 100-300 mm cavity | m2 | 45-55 |
Extra for factory bonded vinyl sheet | m2 | 22-25 |
Taking up and storing tiles | m2 | 10-15 |
Protection to floor tiles | m2 | 2-3 |
Cavity barriers | Ìý | Ìý |
– Half hour fire resistance; 100-200 mm cavity | m | 10-11 |
– One hour fire resistance; 100-200 mm cavity | m | 13-14 |
Acoustic barriers | Ìý | Ìý |
– 100-200 cavity | m | 11-14 |
Hard surface finishes | Ìý | Ìý |
Ceramic floor tiles | m2 | 35-50 |
Riven Welsh slate tiles, 250 × 250 mm | m2 | 60-80 |
Travertine Marble; polished; 20 mm thick | m2 | 150-180 |
Polished granite; 20 mm thick | m2 | 200-250 |
Wood strip; pre-finished tongued and grooved beech or oak | m2 | 90-110 |
Sheet and tile finishes | Ìý | Ìý |
Linoleum sheet/tile | m2 | 28-38 |
Vinyl sheet/tile; heavy duty | m2 | 16-23 |
Anti static vinyl sheet; medium duty | m2 | 15-25 |
Studded rubber tiles, 500 × 500 mm | m2 | 32-40 |
Extra for plywood underlay | m2 | 8-10 |
Carpet | Ìý | Ìý |
Heavy-duty carpet tile; 100% nylon | m2 | 16-22 |
Heavy-duty carpet tile; 80% wool, 20% nylon | m2 | 22-26 |
Medium-duty broadloom; 80% wool, 20% nylon | m2 | 25-30 |
Heavy-duty broadloom; 80% wool, 20% nylon | m2 | 45-50 |
Hand woven | m2 | 100+ |
Extra for underlay | m2 | 5-6 |
Ceiling finishes | Ìý | Ìý |
Jointless plasterboard | Ìý | Ìý |
Plasterboard on M/F system | m2 | 25-35 |
Fibrous plaster feature suspended ceiling | m2 | 125-190 |
Fibre tiles | Ìý | Ìý |
Mineral fibre tiles; plain; exposed grid | m2 | 18-23 |
Mineral fibre tiles; acoustic; exposed grid | m2 | 25-30 |
High density mineral fibre tile; exposed, anti-corrosive grid | m2 | 42-47 |
Metal tiles | Ìý | Ìý |
Non-perforated metal tile suspended ceiling | m2 | 28-40 |
Perforated metal tile; lay-in grid | m2 | 35-50 |
Perforated metal tile; demountable; concealed grid | m2 | 42-65 |
Perforated metal tile; hinge access; concealed grid | m2 | 48-68 |
Perforated acoustic quality metal tile; hinged mega-panel; tartan grid | m2 | 75-100 |
Taking down and storing tiles | m2 | 10-12 |
Fire barrier | m | 30-35 |
Acoustic barrier | m | 30-40 |
Fixtures and fittings | Ìý | Ìý |
Blinds | Ìý | Ìý |
Venetian blinds, cord-operated | m2 | 25-30 |
Fabric roller blinds, cord-operated | m2 | 30-40 |
Fabric blackout blinds, side channels, electrically operated | m2 | 250-350 |
ºÚ¶´ÉçÇø services | Ìý | Ìý |
Mechanical installations | Ìý | Ìý |
Extension of HVAC systems into general office areas | Ìý | Ìý |
– VAV | m2 | 95-135 |
– four-pipe fan coil units | m2 | 100-140 |
– underfloor displacement ventilation (no heating) | m2 | 20-30 |
– Hiross underfloor A/C system | m2 | 125-150 |
– chilled ceiling (extra over suspended ceiling) | m2 | 115-160 |
– floor diffusers (extra over raised floors); one per 5 m2 | m2 | 10-20 |
– LPHW perimeter heating (radiators and pipework) | m2 | 20-30 |
Extension of controls/BMS into general office areas | m2 | 10-20 |
Electrical installations | Ìý | Ìý |
Extension of small power distribution into general office areas | Ìý | Ìý |
– busbar and cables only (no floor boxes) | m2 | 10-15 |
– floor outlet boxes (including lead & plug); 1 per 10 m2 | m2 | 5-6 |
Extension of lighting into general office areas | Ìý | Ìý |
(LG3 luminaires to 350-400 lux) | Ìý | Ìý |
– generally (incl luminaires, wiring & emergency packs) | m2 | 33-40 |
– wiring (conventional or modular) | m2 | 8-10 |
– luminaires to ceilings & wall washers to cores | m2 | 25-30 |
PIR lighting controls into general office areas | m2 | 9-12 |
Supplies to VAV boxes or fan coil units | m2 | 3-4 |
Protective installations | Ìý | Ìý |
Extension of sprinkler network into general office areas | m2 | 12-20 |
Communications | Ìý | Ìý |
Fire alarms (fully addressable); sounder-based | m2 | 4-8 |
Public address system | m2 | 3-8 |
IT/Data cabling (category 6 including cabinets and patch panels); | Ìý | Ìý |
One box per 10 m2 with four outlets each | m2 | 18-30 |
Access control to door including recessed lock, card readers, etc | each | 3000-3500 |
Internal CCTV camera (fixed) | each | 2000-2500 |
Extra for central monitoring equipment (up to 15 cameras) | each | 10000-15000 |
Indicative rates for office furniture | |
Item | Price range £ |
Open-plan offices | Ìý |
Workstation including desk, mobile pedestal. screening, | Ìý |
CPU cradle, monitor arm and accessories | 800-1100 |
Open storage unit | 100-200 |
Task chair | 250-400 |
Filing cabinet | 150-400 |
Subtotal (per workstation) | 1300-2100 |
Extra for managers | Ìý |
Additional pedestal for senior managers | 150-200 |
Meeting table for senior managers | 100-150 |
Meeting chairs (2) | 150-250 |
Total (per workstation) | 1700-2700 |
Cellular offices | Ìý |
Workstation including desk, mobile pedestal, | Ìý |
CPU cradle, monitor arm and accessories (no screening) | 850-1250 |
Filing cabinet | 200-450 |
Pedestal unit | 200-350 |
Manager’s chair | 350-500 |
Meeting table | 150-300 |
Meeting chairs (3) | 250-400 |
Total (per office) | 2000-3250 |
Meeting rooms | Ìý |
Six-person meeting table; hardwood veneered particle board | 600-900 |
Ten-person meeting table; as above | 1000-1300 |
Fourteen-person meeting table; as above | 1600-1900 |
Twenty-person meeting table; as above | 2200-2700 |
Meeting room chair; fabric upholstery | 200-350 |
Conference room chair; leather upholstery | 300-600 |
Console table | 400-600 |
Credenza | 1500-3000 |
Informal meeting areas | Ìý |
Easy chairs | 400-1000 |
Coffee tables | 250-800 |
First aid rooms | Ìý |
Allowance for bed, easy chair, visitor’s chair, cabinet | 2500-4000 |
Staff restaurants | Ìý |
Four-person table | 150-350 |
Eight-person refectory table | 300-500 |
Dining chair | 80-150 |
Site powered by