- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÚ¶´ÉçÇø the Future
- Data
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to date
- ºÚ¶´ÉçÇø Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to dateSpecification options: Ground-source heat pumps | |||
Ìý | Capital cost | Lifecycle cost | Expected service life |
Domestic scale: 4–8kW heat output | Ìý | Ìý | Ìý |
Horizontal pipework laid in trenches | 650–1,050 | 1,180 | 50–100 |
Horizontal looped (slinky) pipework laid flat in trenches | 730–1,130 | 1,360 | 50–100 |
Vertical pipework in boreholes | 700–950 | 1,300 | 50–100 |
Heat pump 4–8kW heat output | 800–1,000 | 2,190 | 15–25 |
Commercial scale: 30–50kW heat output | Ìý | Ìý | Ìý |
Horizontal pipework laid in trenches | 625–1,025 | 1,080 | 50–100 |
Horizontal looped (slinky) pipework laid flat in trenches | 700–1,100 | 1,240 | 50–100 |
Vertical pipework in boreholes | 1,080–1,480 | 1,710 | 50–100 |
Heat pump 30–50kW heat output | 650–800 | 1,790 | 15–25 |
Table notes A discount rate of 3% is used to calculate values. Lifecycle costs are indicative and are based on the average of capital costs and service lives. Lifecycle cost for pipework allows for a probability of pipe failure and costs associated with the circulation pump. Costs in use include inspection, servicing, allowance for responsive maintenance. Distribution side costs and energy costs are excluded. Pipework is a closed loop system of HDPE to relevant British Standards. Heat pump to British Standards noted in text. Pipework costs will vary with nature of soil and heating demand of building. Number and depth of boreholes and degree of grouting will influence cost. Economies of scale may apply to larger developments. A cost analysis based on project specific information is essential for a realistic appraisal. |
Site powered by