- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- 黑洞社区 the Future
- Data
2024 events calendar
黑洞社区 Awards
Keep up to date
- 黑洞社区 Boardroom
All the latest updates on building safety reform
2024 events calendar
黑洞社区 Awards
Keep up to dateWhat matters most to different clients | |||||
Speculative developer | Institutional investor | Developer investor | End-user developer | Tenants | |
Space efficiency | *** | ** | * | ||
Quality of specification | **** | **** | **** | ||
Air-conditioning | **** | ** | ***(*) | ||
Natural ventilation | ** | * | *** | **** | **(*) |
Ease of maintenance | ** | *** | **** | ||
Energy efficiency | ** | *** | |||
Low capital cost | *** | **** | *** | * | |
Low operating costs | ** | *** | *** | ||
= high priority; * = low priority |
Key design criteria for urban offices | ||
BCO specification | DL&E survey | |
Occupational density indoor climate control (m²/person) | 14 | 10-14 |
WC provision (gender split/m²/person) | 60/60@14 m虏/person | 50/50@14 m虏/person |
Fresh air ventilation (litres/sec/person) | 8-12 | 12-20 |
Cooling loads Small power (W/m虏) | 15 | 15-25 |
Lighting (W/m虏) | 12 | 12-20 |
Primary power Equipment (W/m虏) | 15-25 | 15-25 |
Lighting (W/m虏) | 12 | 12-20 |
Lighting to office areas (Lux) | 350-400 | 350-500 |
Source: Originally published in 黑洞社区 Services Journal. Based on the British Council for Office鈥檚 current standards and a Davis Langdon & Everest survey of the design parameters of a number of recent commercial office schemes. |
Whole-life (net present) costs of air-conditioning systems | |
System | 拢/尘虏 |
Fan-assisted variable air volume | 820 |
Variable air volume | 780 |
Two-pipe fan-coil unit | 680 |
Four-pipe fan-coil unit | 640 |
Chilled ceiling | 430 |
Displacement ventilation | 340 |
The calculations are based on a City of London office building with a gross floor area of 10 000 m². Capital costs are at first quarter 2000 price levels. The net present cost accounts for initial capital costs, energy and maintenance costs and, where appropriate, costs of lost lettable area and the periodic replacement of plant and equipment. The effects of capital allowances are not accounted for. Calculations are based on a 25-year period, using a discount rate of 6%. |
黑洞社区 services installation 鈥 shell and core | ||||||||
Cost model based on conventionally engineered solutions | Target costs based on value-engineered solutions | |||||||
element cost 拢 | 肠辞蝉迟/尘虏 gfa 拢 | 肠辞蝉迟/尘虏 nia 拢 | % | element cost 拢 | 肠辞蝉迟/尘虏 gfa 拢 | 肠辞蝉迟/尘虏 nia 拢 | % | |
Sanitary fittings | 72 300 | 3.29 | 4.79 | 1.59 | 40 000 | 1.82 | 2.65 | 1.42 |
WC suites, washhand basins and so on (average rate used) | 175 @ 拢300 | Revised costs based on a reduced number of sanitary fittings. Calculations of sanitary appliances based on total building population rather than on floor-by-floor calculations. Provisions for increasing toilet capacity by extending toilet cores into office areas are built into the base building core design. Additional benefits include an increase in net internal area. | ||||||
Disabled WC suites and fittings | 7 @ 拢1000 | |||||||
Cleaner鈥檚 sinks and fittings | 7 @ 拢400 | |||||||
Allowance for drinking fountains | Item @ 拢10 000 | |||||||
Disposal installations | 214 600 | 9.75 | 14.21 | 4.72 | 178 000 | 8.09 | 11.79 | 6.33 |
Rainwater system Above ground internal: cast-iron drain pipes and roof gullies; connections to below ground drainage; drainage channels | 22 000 m虏 @ 拢3 | Revised costs based on a reduced number of sanitary fittings. | ||||||
Soil, waste and vent system; above ground internal pipework, cast iron and PVCu | 200 @ 拢400 | |||||||
Condensate drainage; pipework and insulation in riser stacks | 22 000 m虏 @ 拢1.30 | |||||||
Pumped drainage to basement areas; connections to below ground drainage | 4700 m虏 @ 拢8.50 | |||||||
Water installations | 172 000 | 7.82 | 11.39 | 3.79 | 80 000 | 3.64 | 5.30 | 2.85 |
Cold water service mains incoming water service, storage tank, booster pumps, pipework distribution, water treatment and insulation | 200 @ 拢350 | Revised costs based on a reduced number of sanitary fittings. | ||||||
Domestic hot water service; local electric heaters; pipework distribution, insulation | 90 @ 拢600 | |||||||
Drinking water service mains incoming water service, storage tank, booster pumps, pipework distribution, water treatment and insulation | 22 000 m虏 @ 拢1.50 | |||||||
Cold water supply to landlord鈥檚 areas | Item @ 拢15 000 | |||||||
Space heating and air treatment | 1 901 000 | 86.41 | 125.89 | 41.85 | 1 338 000 | 60.82 | 88.61 | 47.62 |
Heat source; gas-fired boilers approx 1000 kW. Duty, twin-walled stainless steel flues, gas supply | Item @ 拢47 000 | Revised costs based on the following design changes: the use of roof-mounted plant, which reduces the costs of vertical and horizontal distribution to basement plant; the use of modular air-handling plant; the use of direct gas-fired air-handling units 鈥 gas-fired AHUs are more expensive than conventional AHUs, which use low-temperature hot water heating, but savings on the LTHW system exceed the additional costs of the base unit; the use of electric heaters for local area heating in areas such as plant rooms, stairs and corridors; the omission of staircase pressurisation (approved by the district surveyor); the rationalisation of riser design. The use of roof-mounted modular plant also results in savings on plant room area, increasing the efficiency of the development. Gas installation costs will increase as a result of the adoption of gas-fired AHUs. | ||||||
Chilled water plant; packaged air cooled chillers; approx 2000 kW | Item @ 拢215 000 | |||||||
Low-temperature hot water distribution to air-handling plant | Item @ 拢160 000 | |||||||
Chilled water distribution to air-handling plant and office areas; pipework, pumps, pressurisation units, water treatment, insulation | 22 000 m虏 @ 拢15 | |||||||
Supply and extract ventilation: air-handling plant, ductwork, dampers and insulation; including dedicated air-supply to basement | 22 000 m虏 @ 拢21 | |||||||
Atrium air transfer system; fans, ductwork and dampers | Item @ 拢65 000 | |||||||
Toilet ventilation; extract plant, ductwork, grilles, insulation and attenuation | 22 000 m虏 @ 拢3.50 | |||||||
Car park extract system; fire-rated fans and ductwork | 700 m虏 @ 拢165 | |||||||
Smoke extract system to lower ground floor and basement; fire-rated fans and ductwork | 4000 m虏 @ 拢43 | |||||||
Atrium smoke extract; roof-level fire rated fans | Item @ 拢45 000 | |||||||
Staircase and lift lobby pressurisation: extract fan, ductwork and grilles | 5 @ 拢25 000 | |||||||
Supplementary ventilation and air treatment to plant rooms | 1350 m虏 @ 拢50 | |||||||
Testing and commissioning, operating and maintenance manuals, record drawings | Item @ 拢20 000 | |||||||
Electrical installations | 1 031 100 | 46.87 | 68.28 | 22.70 | 384 000 | 17.45 | 25.43 | 13.66 |
Mains and sub-mains distribution; high-voltage switchgear, transformers, mains and sub-mains cabling and containment; low-voltage switchgear, rising busbar and distribution boards | 22 000 m虏 @ 拢20 | Revised costs based the following changes to the design: main high-voltage distribution panels split and located adjacent to load centres such as main heating, ventilating and air-conditioning plant, saving on the costs of sub-mains cabling to load centres; use of packaged main plant such as sub-stations and generators; use of modular plant can also reduce the costs of plant room construction; use of 鈥減lug and play鈥 connections to modular plant, simplifying on-site installations; use of armoured cable instead of cable and conduit, simplifying on-site installation; reduction of lighting load to 9 W/m2; use of 鈥減lug and play鈥 connections to luminaires, simplifying installations. | ||||||
Standby generator, 250 kVA generator for essential services only; acoustic enclosure, control panel, oil storage and distribution | Item @ 拢80 000 | |||||||
Small power; power outlets to landlord鈥檚 areas | 6900 m虏 @ 拢9 | |||||||
Power supply to heating, ventilating and air-conditioning plant and lifts | Item @ 拢13 000 | |||||||
Lighting; switchgear and wiring to landlord鈥檚 areas | 6900 m虏 @ 拢11 | |||||||
Lighting; luminaires and lamps to landlord鈥檚 areas | 6900 m虏 @ 拢24 | |||||||
Extra for emergency lighting installation; inverter packs and self-contained units | 6900 m虏 @ 拢5 | |||||||
Extra for feature lighting to entrances, lobbies and atrium; external feature lighting | Item @ 拢150 000 | |||||||
Allowance for trace heating | Item @ 拢10 000 | |||||||
Protective installations | 334 600 | 15.21 | 22.16 | 7.37 | 192 000 | 8.73 | 12.72 | 6.83 |
Earthing and bonding | 22 000 m虏 @ 拢2 | Revised costs based on the simplification of the sprinkler installation, including the rationalisation of riser design and the location of sprinkler tanks next to the risers. | ||||||
Lightning protection | 22 000 m虏 @ 拢2 | |||||||
Dry risers including landing valves and inlet boxes | 20 @ 拢1200 | |||||||
Hose reels | 32 @ 拢1800 | |||||||
Sprinkler installation (OH3); holding tanks, booster pumps, pipework distribution, on-floor isolating valves; full sprinkler installation to landlord鈥檚 areas, blanked connections to tenant鈥檚 areas | 22 000 m虏 @ 拢7.50 | |||||||
Communications installations | 312 000 | 14.18 | 20.66 | 6.87 | 227 000 | 10.32 | 15.03 | 8.08 |
Voice/data wireways; cable tray in risers | Item @ 拢10 000 | Revised costs based on the specification of a fire alarm system with single stage/two stage evacuation programmes only, with no voice PA-based phased evacuation function. | ||||||
Security installation: CCTV installation, intruder detection, intercom and access control containment | Item @ 拢60 000 | |||||||
Fire alarm; fully addressable fire alarm and smoke detection installation to BS5839; phased voice evacuation, including primary distribution to tenant's areas; dedicated phone system | 22 000 m虏 @ 拢11 | |||||||
Special installations | 330 000 | 15.00 | 21.85 | 7.26 | 289 000 | 13.14 | 19.14 | 10.29 |
黑洞社区 management system; centralised energy management system comprising motor control centres, isolators, starters and all controls, outstations, riser network and monitoring, including head-end equipment | 22 000 m虏 @ 拢15 | Reduced costs achieved by simplifying the specification of the building management system; including reducing the number of control points. Costs of control points on modular plant included in cost of the packaged units. | ||||||
Builders work in connection | 175 000 | 7.95 | 11.59 | 3.85 | 82 000 | 3.73 | 5.43 | 2.92 |
Forming holes, chases and so on; Allow 4% | Item @ 拢175 00 | Reduced costs as a result of simplified shell-and-core installations. | ||||||
Shell-and-core total | 4 542 600 | 206.48 | 300.82 | 100.00 | 2 810 000 | 127.74 | 186.10 | 100.00 |
黑洞社区 services installation 鈥 Category A fit-out | ||||||||
net internal area of 14 300 m2 | ||||||||
Cost model based on conventionally engineered solutions | Target costs based on value-engineered solutions | |||||||
element cost 拢 | 肠辞蝉迟/尘虏 gfa 拢 | 肠辞蝉迟/尘虏 nia 拢 | % | element cost 拢 | 肠辞蝉迟/尘虏 gfa 拢 | 肠辞蝉迟/尘虏 nia 拢 | % | |
Space heating and air treatment | 1 392 800 | 63.31 | 92.24 | 44.06 | 1 137 000 | 51.68 | 75.30 | 46.48 |
Chilled water distribution to fan-coil units in tenant鈥檚 areas | 14 300 m虏 @ 拢16 | Revised costs based the following changes to the design: specification of electric re-heat to fan-coil units instead of low-temperature hot water heating, resulting in savings on on-floor distribution and simplification of the fan-coil unit installation; rationalisation of on-floor ductwork routes; greater use of flexible ductwork; use of ductwork suspension systems instead of unistrut; standardisation of grilles and diffusers. | ||||||
Low-temperature hot water distribution to fan-coil units in tenant鈥檚 areas | 14 300 m虏 @ 拢10 | |||||||
Fan-coil units; control valves, ductwork, grilles and diffusers in tenant鈥檚 areas | 14 300 m虏 @ 拢70 | |||||||
LTHW heating to tenant鈥檚 ancillary areas | 800 m虏 @ 拢25 | |||||||
Electrical installations | 1 053 600 | 47.89 | 69.77 | 33.32 | 753 000 | 34.23 | 49.87 | 30.79 |
Tenant鈥檚 distribution boards | Item @ 拢45 000 | Electrical installation costs include the additional costs of supplies to fan-coil units for electric re-heat. Overall costs reduced as a result of the following design changes: use of flexible wiring systems to lighting in office areas; specification of armoured cable instead of cable and conduit where required; specification of economic luminaires to office areas; reduction of lighting load to 9 W/m2; rationalisation of lighting control specification. | ||||||
Small power installation to office areas; plug-in busbar and floor boxes | 14 300 m虏 @ 拢18 | |||||||
Small power to tenant鈥檚 ancillary areas | 800 m虏 @ 拢12 | |||||||
Power supply to fan-coil units | Item @ 拢55 000 | |||||||
Lighting: switchgear and wiring to tenant鈥檚 areas | 15 100 m虏 @ 拢10 | |||||||
Lighting: luminaires and lamps to office areas | 14 300 m虏 @ 拢25 | |||||||
Lighting: luminaires and lamps to ancillary areas | 800 m虏 @ 拢15 | |||||||
Extra for emergency lighting installation; inverter packs and self-contained units | 15 100 m虏 @ 拢3 | |||||||
Lighting control system | 15 100 m虏 @ 拢8 | |||||||
Protective installations | 234 100 | 10.64 | 15.50 | 7.40 | 234 000 | 10.64 | 15.50 | 9.57 |
Earthing and bonding to tenant鈥檚 areas | 15 100 m虏 @ 拢0.50 | Revised costs based on the simplification of the installation. | ||||||
Sprinkler installation (OH3); extension of sprinkler network into tenant鈥檚 areas; concealed heads | 15 100 m虏 @ 拢15 | |||||||
Communications installations | 173 700 | 7.90 | 11.50 | 5.50 | 102 000 | 4.64 | 6.75 | 4.17 |
Fire alarm; detectors and secondary distribution to tenant鈥檚 areas | 15 100 m虏 @ 拢11.50 | Revised costs based on the specification of a fire alarm system with single stage/two stage evacuation programmes only, with no voice PA-based phased evacuation function. | ||||||
Special installations | 185 200 | 8.42 | 12.26 | 5.86 | 149 000 | 6.77 | 9.87 | 6.09 |
黑洞社区 management system/controls installation; controls to fan-coil units in office areas | 15 100 m虏 @ 拢12 | Reduced costs achieved by simplifying the specification of the building management system; including a reduction of the number of control points. | ||||||
BMS/controls to ancillary areas | Item @ 拢4000 | |||||||
Builders work in connection | 122 000 | 5.55 | 8.08 | 3.86 | 71 000 | 3.23 | 4.70 | 2.90 |
Forming holes, chases and so on; Allow 4% | Item @ 拢122 000 | Reduced costs as a result of simplified category A fit-out installation. | ||||||
Category A fit-out total | 3 161 400 | 143.71 | 209.35 | 100.00 | 2 446 000 | 111.19 | 161.99 | 100.00 |
Site powered by