- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÚ¶´ÉçÇø the Future
- Data
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to date
- ºÚ¶´ÉçÇø Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to dateEnclosed malls or open centres? | ||
Enclosed mall | Open arcade | |
Advantages | Weather protection. | Easier to integrate into existing urban fabric. |
Perceived as being safe, controlled environments. | Easier to include a variety of spaces in the design. | |
Easily branded and managed. | Easier to adapt in response to change. | |
Clear demarcation of management responsibilities. | Provides an opportunity to introduce a wider number of uses behind varied facades that can accommodate varied floor heights and frontages. | |
Easier to create and manage high quality lighting, entertainment and other features. | Lower capital and energy costs. | |
Easily accessible management and information services. | Lower service charges to tenants. | |
Permits open shopfronts and greater flexibility in presentation of goods by retailers. | ||
Disadvantages | High capital and running costs. | Limited weather protection. |
Climate control and lighting results in high energy usage. | More difficult to brand and to manage. | |
Insularity and lack of permeability – fewer pedestrian and visual links with the rest of the city. | Perception of reduced safety and security. | |
Problems of lack of visibility of shop units from outside. | More difficult and expensive to clean and maintain. | |
Faster deterioration of building fabric. | ||
Limits on shopfront design options as open shopfronts are not possible. |
Cost breakdown | |
Development type | Unit cost (£/m2) |
Shopping centre, new build | |
Shopping centre mall; comfort cooled | 2400-3700 |
Factory outlet centre, enclosed mall | 2200-3400 |
Factory outlet centre | 400-700 |
Anchor store units | 500-800 |
Medium/small store units | 650-900 |
Centre management/creche | 950-1350 |
WCs | 1500-2300 |
Enclosed, surface level service yard | 750-950 |
Shopping Centre, refurbishment | |
Shopping centre mall; limited scope | 800-1200 |
Shopping centre mall; comprehensive | 1150-1700 |
Car parking, surface | 40-60 |
Car parking, surface, landscaped | 70-95 |
Car parking, grade and upper level | 120-180 |
Car parking, multistorey, flat slab | 245-315 |
Car parking, semi-basement, naturally ventilated | 325-380 |
Car parking, completely underground beneath building | 650-820 |
Leisure shell | 600-900 |
Multiplex cinema (shell only) | 650-900 |
Enclosed mall | ||||
element cost | cost/m2 gfa £ | % of total cost | ||
Demolitions | 420,000 | 60 | 1.88 | |
Demolition and site clearance; temporary works; associated works | 4000 m2 @ £70 | |||
Allowance for services and drainage diversions; builders work | 4000 m2 @ £35 | |||
Substructure | 942,000 | 134.57 | 4.21 | |
Ground slab; 200 thick reinforced insitu concrete slab, ground beams; sub-base; damp proof membrane | 4000 m2 @ £130 | |||
CFA piling; pile caps | 4000 m2 @ £90 | |||
Extra for foundations to mall features | Item @ £25,000 | |||
Allowance for lift pit | Item @ £7000 | |||
Allowance for escalator pits | 6 @ £5000 | |||
Frame | 851,500 | 121.64 | 3.81 | |
Structural steel frame supporting retail frontage, first floor mall etc; allowance based on 50 kg/m2; universal and hollow sections; fire protection, surface finishes | 235t @ £1900 | |||
Structural steel frame; to support roof and clerestory; allowance based on 35 kg/m2; universal and hollow sections; fire protection, surface finishes | 150t @ £1900 | |||
Allowance for feature steelwork to bridges across arcade | 6 @ £20,000 | |||
Upper Floors | 245,000 | 35 | 1.1 | |
Composite construction; insitu concrete slabs on metal decking; power floating | 3000 m2 @ £60 | |||
Insitu concrete flat slabs, 200 thick; to flat roof; parapets and upstands | 500 m2 @ £90 | |||
Extra for openings for staircases and escalators | Item @ £20,000 | |||
Roof | 4,800,000 | 685.71 | 21.46 | |
Glazed, vaulted roof at first floor floor level; 19 m wide on plan; sealed double glazed units, automatic opening vents; powder coated aluminium frame; feature secondary steelwork; rainwater goods | 3000 m2 @ £800 | |||
Aluminium panelling; to vaulted roof; 19 m wide on plan; powder coated; secondary steelwork; rainwater goods | 1000 m2 @ £500 | |||
Perforated aluminium solar shading; to vaulted glazed roof ; shading to 50 of glazed area | 1500 m2 @ £500 | |||
Metal cladding at clerestory level to sides of mall roof; powder coated aluminium; 3.5 m high; plasterboard backing; insulation | 1750 m2 @ £200 | |||
Flat roof finishes; sarnafil; insulation; leadwork; additional works to perimeters and openings | 750 m2 @ £80 | |||
Feature entrance canopies; single glazed; stainless steel supports Item | @ £300,000 | |||
Allowance for mansafe roof access system | Item @ £10,000 | |||
External roof cleaning access; mobile gantries | Item @ £400,000 | |||
Internal cleaning access; cherry picker | Item @ £30,000 | |||
Stairs | 965,000 | 137.86 | 4.31 | |
Feature stairs from arcade to first floor; 6 m rise, cast iron balustrades, hardwood handrails, stone finishes | 2 @ £60,000 | |||
Armoured glass balustrading; hardwood handrail; to first floor voids | 700 m @ £1000 | |||
Extra for curved balustrading | 100 m @ £400 | |||
Sundry metalwork | Item @ £75,000 | |||
Allowance for access stairs, platforms and cat ladders to plant areas and roofs | Item @ £30,000 | |||
External Walls | 800,000 | 114.29 | 3.58 | |
Structural glazing to mall entrances; double glazed; feature support frame | 1000 m2 @ £800 | |||
Windows/Shopfronts/Doors | 501,000 | 71.57 | 2.24 | |
Temporary shopfronts; painted ply; access door; quantity based on 50 requirement; (permanent shopfronts by tenant) | 1200 m2 @ £55 | |||
Feature windows; single glazed units; powder coated aluminium frame; 1.5 m x 1.5 m | 50 @ £700 | |||
Mall entrance doors; automatic rotating doors and manual doors | 4 @ £100,000 | |||
Internal partitions and doors | 270,500 | 38.64 | 1.21 | |
Fire escape/service doors to mall; flush; hardwood frames; stainless steel ironmongery, finishes; single 5 | @ £1100 | |||
Fire escape/service doors to mall; flush; hardwood frames; stainless steel ironmongery, finishes; double 10 | @ £1500 | |||
Allowance for sundry doors Item | @ £10,000 | |||
Internal partitions, linings and backing panels; plasterboard/blockwork; average rate used | 2000 m2 @ £70 | |||
Glazed cladding to feature lifts; single glazed structural glass; frame and fixings | Item @ £70,000 | |||
Allowance for additional work in connection with partitions and doors | Item @ £30,000 | |||
Wall finishes | 1,292,000 | 184.57 | 5.77 | |
Feature bulkhead above shopfronts; glass reinforced gypsum; framing; surface finish; accessories; 1 m high by 500 mm deep | 800 m @ £200 | |||
Feature bulkhead to first floor voids; glass reinforced gypsum; framing; surface finish; accessories; 700 high by 500 mm deep | 700 m @ £200 | |||
Extra for curved bulkheads | 100 m @ £200 | |||
Natural stone column cladding; 1 m wide by 5 m high; blockwork backing; fixings | 80 @ £2200 | |||
Natural stone column cladding; 1 m wide by 4 m high; blockwork backing; fixings | 80 @ £1800 | |||
Metal feature fascia panel above shopfronts; 1.2 m high | 840 m @ £300 | |||
Wall finishes generally; to clerestory and internal walls; feature finishes including stone panelling features; cornice details | Item @ £400,000 | |||
Floor finishes | 1,460,000 | 208.57 | 6.53 | |
Stone tiling; including patterns and features; trim strips; skirting; screeds; movement joints | 7000 m2 @ £19 | |||
Extra over for mats and matwells | Item @ £80,000 | |||
Allowance for additional floor features to entrances and squares | Item @ £50,000 | |||
Ceiling finishes | 655,000 | 93.57 | 2.93 | |
Feature suspended ceilings to first floor soffit; glass reinforced gypsum; framing; surface finishes; accessories | 1100 m2 @ £150 | |||
Extra for feature finish to soffit of walkways across mall at first floor level; metal and glass panels | 400 m2 @ £350 | |||
Allowance for additional ceiling features | Item @ £100,000 | |||
Allowance for glazed smoke curtains at high level; fire shutters etc | Item @ £250,000 | |||
Furniture and fittings | 900,000 | 128.57 | 4.02 | |
Allowance for mall furniture including bins, benches, bollards etc | Item @ £100,000 | |||
Allowance for statutory and directional signage to mall | Item @ £50,000 | |||
Allowance for feature signage including banners, directories, graphics etc | Item @ £200,000 | |||
Allowance for planting | Item @ £50,000 | |||
Allowance for mall features; water features etc | Item @ £500,000 | |||
Disposal installations | 100,000 | 14.29 | 0.45 | |
Rainwater disposal; cast iron downpipes and fittings | Item @ £40,000 | |||
Below ground drainage; manholes, covers etc | Item @ £60,000 | |||
Water installations | 20,000 | 2.86 | 0.09 | |
Landlords supplies to mall only | Item @ £20,000 | |||
Space heating air treatment | 1,040,000 | 148.57 | 4.65 | |
Supply and extract ventilation installation to mall; low temperature, hot-water heating circuit including heat source; chilled water circuit including chiller plant; air handling units; perimeter ductwork distribution; high quality diffusers; provision for smoke extract through air handling units | 7000 m2 @ £140 | |||
Warm air curtains; to mall entrances | Item @ £60,000 | |||
Electrical installations | 1,236,000 | 176.57 | 5.52 | |
Mains and sub-mains distribution | 7000 m2 @ £25 | |||
Electrical power to main plant | Item @ £18,000 | |||
Landlord's small power to mall | 7000 m2 @ £8 | |||
Lighting and luminaires to mall | 7000 m2 @ £125 | |||
Electrical installations, continued Extra for emergency lighting | 7000 m2 @ £15 | |||
Earthing and bonding | 7000 m2 @ £1 | |||
Lift and escalator installations | 775,000 | 110.71 | 3.46 | |
Escalators from mall to first floor; 6 m rise; glass balustrade; stainless steel finishes | 6 @ £100,000 | |||
Feature lift including glass car; 13 person; two stops; hydraulic | 1 @ £175,000 | |||
Protective installations | 115,000 | 16.43 | 0.51 | |
Lightning protection | Item @ £10,000 | |||
Sprinkler installation; heads, distribution and share of infrastructure | 7000 m2 @ £15 | |||
Communication installations | 535,000 | 76.43 | 2.39 | |
Fire alarm system; fully addressible, smoke detectors and infra-red sensors | 7000 m2 @ £30 | |||
Public address system | 7000 m2 @ £25 | |||
CCTV system (rate per camera) | 30 @ £5000 | |||
Special installations | 540,000 | 77.14 | 2.41 | |
ºÚ¶´ÉçÇø management system; including provision for interfaces with shop units | 7000 m2 @ £20 | |||
People counting, to arcade and shop unit entrances | Item @ £400,000 | |||
Builders work in connection | 220,000 | 31.43 | 0.98 | |
Forming holes, chases etc – allow 5% | Item @ £220,000 | |||
Preliminaries and contingencies | 3,690,000 | 527.14 | 16.49 | |
Contractor's overheads, site establishment and site supervision, allow 14% | Item @ £2,620,000 | |||
Contingency sum – allow 5% | Item @ £1,070,000 | |||
TOTAL CONSTRUCTION COST (BUILDING ONLY) | £22,373,000 | £3196.13 | 100.00 |
Open arcade | ||||
element cost | cost/m2 gfa £ | % of total cost | ||
Demolitions | 400,000 | 57.14 | 2.6 | |
Demolition and site clearance; temporary works; associated works | 4000 m2 @ £70 | |||
Allowance for services and drainage diversions; builders work | 4000 m2 @ £30 | |||
Substructure | 782,000 | 111.71 | 5.09 | |
Ground slab; 150 thick insitu concrete bed; ground beams; sub-base | 4000 m2 @ £100 | |||
CFA piling; pile caps | 4000 m2 @ £80 | |||
Extra for foundations to arcade features | Item @ £25,000 | |||
Allowance for lift pit | Item @ £7000 | |||
Allowance for escalator pits | 6 @ £5000 | |||
Frame | 777,000 | 111 | 5.05 | |
Structural steel frame supporting retail frontage, first floor arcade, etc; allowance based on 50 kg/m2; fire protection, surface finishes | 265t @ £1800 | |||
Structural steel frame; to support parapets, canopies and flat roof; allowance based on 35 kg/m2; fire protection, surface finishes | 100t @ £1800 | |||
Allowance for feature steelwork to bridges across arcade | 6 @ £20,000 | |||
Upper Floors | 290,000 | 41.43 | 1.881 | |
Composite construction; insitu concrete slabs on metal decking; power floating | 3000 m2 @ £60 | |||
Insitu concrete flat slabs, 200 thick; to flat roof; parapets and upstands | 1000 m2 @ £90 | |||
Extra for openings for staircases and escalators | Item @ £20,000 | |||
Roof | 2,310,000 | 330 | 15.03 | |
Glazed, monopitch canopies at first floor floor level; 4m wide on plan; feature secondary steelwork; rainwater goods | 2000 m2 @ £800 | |||
Feature canopies spanning across open arcade; PTFE fabric; cabling and secondary support forming tension structure; rainwater goods | 400 m2 @ £500 | |||
perimeters and openings | 1000 m2 @ £80 | 80 | ||
Structural glass roofing to enclosures covering circulation areas, escalators, lift and stairs; secondary steelwork, rainwater goods | 300 m2 @ £900 | |||
Allowance for roof features to main entrances | Item @ £100,000 | |||
Allowance for mansafe roof access system | Item @ £40,000 | |||
Internal cleaning access; cherry picker | Item @ £20,000 | |||
Stairs | 680,000 | 97.14 | 4.42 | |
Feature stairs from arcade to first floor; 5m rise, stainless steel balustrades, hardwood handrails, stone finishes | 2 @ £60,000 | |||
Stainless steel balustrading; hardwood handrail; to first floor voids | 700 m @ £600 | |||
Extra for curved balustrading | 100 m @ £400 | |||
Sundry metalwork including cast iron balustrades and grilles to external walls | Item @ £75,000 | |||
Allowance for access stairs, platforms and cat ladders to plant areas and roofs | Item @ £25,000 | |||
External walls | 2,087,000 | 298.14 | 13.58 | |
Natural stone cladding to columns; 1.00m wide by 5.0m high; blockwork backing; insulation; stainless steel fixings | 80 @ £2,400 | |||
Natural stone cladding to columns; 1.00m wide by 4.0m high; blockwork backing; insulation; stainless steel fixings | 80 @ £2,000 | |||
Metal feature fascia panel above shopfronts; 1.20m high | 840 m @ £250 | |||
Reconstituted stone cladding above shopfronts/walls; blockwork backing walls; including allowance for features; insulation, fixings | 700 m2 @ £450 | |||
Timber feature panelling; external quality veneer panels; above shopfronts/walls; framing, blockwork backing; fixings | 700 m2 @ £300 | |||
Rainscreen panels; powder coated aluminium; insulation, framing, blockwork backing; fixings | 1000 m2 @ £325 | |||
Parapet detail above canopies at first floor level; 1.50m high; aluminium panelling; cornice detail; dressing to flat roof finish | 500 m @ £750 | |||
Glazed cladding to feature lifts; single glazed structural glass; frame and fixings | Item @ £70,000 | |||
Allowance for wall features, including stone features at entrances | Item @ £200,000 | |||
Additional works to external walls including grilles and louvres | Item @ £30,000 | |||
Windows/shopfronts/doors | 147,000 | 21 | 0.951 | |
Temporary shopfronts; painted ply; access door; quantity based on 50 requirement; (permanent shopfronts by tenant) | 1200 m2 @ £60 | |||
Feature windows; single glazed units; powder coated aluminium frame; 1.5m x 1.5m | 50 @ £700 | |||
Fire escape/service doors to arcade; timber faced; sheet steel reinforced; stainless steel ironmongery; single | 5 @ £1600 | |||
Fire escape/service doors to arcade; timber faced; sheet steel reinforced; stainless steel ironmongery; single | 10 @ £2200 | |||
Allowance for sundry doors | Item @ £10,000 | |||
Wall finishes | 370,000 | 52.86 | 2.41 | |
Feature bulkhead above shopfronts; glass reinforced gypsum; framing; surface finish; openings for grilles; accessories; 1m high x 500mm deep | 800 m @ £200 | |||
Feature bulkhead to first floor voids; glass reinforced gypsum; framing; surface finish; openings for voids; accessories; 500mm high x 500mm deep | 700 m @ £150 | |||
Extra for curved bulkheads | 100 m @ £150 | |||
Natural stone trim; to edge of first floor slab | 600 m @ £150 | |||
Floor finishes | 1,105,000 | 157.86 | 7.19 | |
Stone paving; including patterns; features; trim strips; skirting; screeds; movement joints | 4000 m2 @ £200 | |||
Brick paving; including patterns and features | 3000 m2 @ £70 | |||
Allowance for continuous gutter; steel grating and outlets | 300 m @ £150 | |||
Allowance for additional floor features | Item @ £50,000 | |||
Ceiling finishes | 345,000 | 49.29 | 2.24 | |
Feature ceiling below first floor colonnade; glass reinforced gypsum; framing; surface finish; accessories | 1100 m2 @ £150 | |||
Extra for metal and glass feature finish to soffit of bridges at first floor level | 400 m2 @ £450 | |||
Furniture and fittings | 650,000 | 92.86 | 4.23 | |
Allowance for street furniture; bins, benches, bollards etc | Item @ £120,000 | |||
Allowance for statutory and directional signage to mall | Item @ £30,000 | |||
Allowance for feature signage; banners, directories, graphics etc | Item @ £150,000 | |||
Allowance for planting and trees; including grilles, containers, drainage and irrigation | Item @ £150,000 | |||
Allowance for arcade features; main entrances treatment, artworks, etc | Item @ £200,000 | |||
Disposal installations | 130,000 | 18.57 | 0.85 | |
Rainwater disposal; cast iron downpipes and fittings | Item @ £50,000 | |||
Below ground drainage; manholes, covers etc | Item @ £80,000 | |||
Water installations | 20,000 | 2.86 | 0.13 | |
Landlord's supplies to arcade only | Item @ £20,000 | |||
Electrical installations | 868,000 | 124 | 5.65 | |
Mains and sub-mains distribution | 7000 m2 @ £25 | |||
Landlord's small power to arcade and circulation areas; weather proofed to IP65 | 7000 m2 @ £8 | |||
Lighting and luminaires to arcade; weather proofed to IP65 | 7000 m2 @ £80 | |||
Extra for emergency lighting | 7000 m2 @ £10 | |||
Earthing and bonding | 7000 m2 @ £1 | |||
Lift installations | 865,000 | 123.57 | 5.63 | |
Escalators from arcade to first floor; 6m rise; glass balustrade; stainless steel finishes | 6 @ £115,000 | |||
Feature lift including glass car; 13 person; two stops; hydraulic | 1 @ £175,000 | |||
Protective installations | £10,000 | 1.43 | 0.07 | |
Lightning protection | Item @ £10,000 | |||
Communication installations | 430,000 | 61.43 | 2.8 | |
Fire alarm system; fully addressable | 7000 m2 @ £15 | |||
Public address system | 7000 m2 @ £25 | |||
CCTV system (rate per camera) | 30 @ £5000 | |||
Special installations | 435,000 | 62.14 | 2.83 | |
ºÚ¶´ÉçÇø management system; lighting control, allowance for interface with retail units | 7000 m2 @ £5 | |||
People counting, to arcade and shop unit entrances | Item @ £400,000 | |||
Builders work in connection | 140,000 | 20 | 0.91 | |
Forming holes, chases, etc – allow 5% | Item @ £140,000 | |||
Preliminaries and contingencies | 2,530,000 | 361.43 | 16.46 | |
Contractor's overheads, site establishment and site supervision, allow 14% | Item @ £1,800,000 | |||
Contingency sum – allow 5% | Item @ £730,000 | |||
TOTAL CONSTRUCTION COST (BUILDING ONLY) | £15,371,000 | £2195.86 | 100.00 | |
Regional variation | |
Inner London | 1.10 |
Outer London | 1.04 |
South-west England | 0.97 |
East Midlands | 0.93 |
West Midlands | 0.95 |
East Anglia | 0.93 |
Yorkshire and Humberside | 0.89 |
North-west England | 0.92 |
Northern England | 0.92 |
Scotland | 0.93 |
Wales | 0.89 |
The cost breakdown is based on a project in south-east England and should be adjusted by the following location factors for schemes in other regions. |
Site powered by