Keep up to dateCost analysis for a 4900 m2 supermarket | ||
Ìý | Cost/m2 (£) | % of total cost |
Substructure | 65 | 5.91 |
Pad and ground beam foundations, reinforced insitu concrete slab on hardcore, service ducts etc | Ìý | Ìý |
Frame | 72.5 | 6.59 |
Steel frame to 8 x 10 m grid with lattice steel roof trusses and Z purlins. Columns protected. Steel frame to feature tower | Ìý | Ìý |
Roof (5900 m2) | 63 | 5.73 |
1.55 Trocal membrane or insulation on steel decking - 4800 m2 at £45.00 | Ìý | Ìý |
Natural slating as edge treatment on felt and timber with profile cladding at rear and luxalon soffit - 1100 m2 at £84.50 | Ìý | Ìý |
External walls (1306 m2) | 31 | 2.82 |
Facing cavity brick and blockwork - 750 m2 at £50.00 | Ìý | Ìý |
Engineering brick splayed plinth below shopfronts etc - 90 m2 at £82.50 | Ìý | Ìý |
Powder-coated aluminium glazed shopfront - 250 m2 at £350.00 | Ìý | Ìý |
Metal cladding system to feature tower - 2:6 m2 at £90.00 | Ìý | Ìý |
Windows | 6 | 0.55 |
Double-glazed powder-coated aluminium windows. | Ìý | Ìý |
Window blinds. Louvres to plant rooms - 118 m2 at £250.00 | Ìý | Ìý |
External doors | 14 | 1.27 |
Main air-entrance door, double-glazed powder-coated aluminium escape and staff entrance doors. Metal rooler shutter doors | Ìý | Ìý |
Internal walls and partitions | 17 | 1.54 |
Blockwork partitions, Glazed powder-coated glazed aluminium screen to coffee shop. Toilet parititions | Ìý | Ìý |
Internal doors | 8 | 0.72 |
Solid core timber doors, some with laminate facing. Rubber doors. Steel fire and roller doors | Ìý | Ìý |
Wall finishes (3920 m2) | 14 | 1.27 |
Emulsion paint on fair face - 1000 m2 at £2.40 | Ìý | Ìý |
Vinyl wallpaper or emulsion pait on plaster to offices etc - 1440 m2 at £10.00 | Ìý | Ìý |
Ceramic wall tiles to sales/preparation areas etc - 1480 m2 at £35.00 | Ìý | Ìý |
Floor finishes (4625 m2) | 30 | 2.73 |
Terrazzo flooring to sales areas - 2615 m2 at £35.00 | Ìý | Ìý |
Ceramic floor tiles to toilets etc - 360 m2 at £55.00 | Ìý | Ìý |
Carpet to office areas etc - 700 m2 at £26.00 | Ìý | Ìý |
Epoxy resin flooring to storage areas - 900 m2 at £18.50 | Ìý | Ìý |
Vinyl sheet flooring - 50 m2 at £16.50 | Ìý | Ìý |
Ceiling finishes | 22 | 2 |
Emulsion paint on plasterboard. Metal panel suspended ceiling tiles in concealed/exposed grid sytems | Ìý | Ìý |
Furniture and fittings | 105 | 9.54 |
Fitting out coffee shop, internal and external sign, shop fittings (except refrigerated units), checkouts, racking and shelving | Ìý | Ìý |
Sanitary appliances | 6 | 0.55 |
WCs, urinals and hand basins, showers etc | Ìý | Ìý |
Services equipment | 300 | 27.27 |
Kitchen equipment, bakery equipment, sales refrigeration units and serving counter for coffee shop etc | Ìý | Ìý |
Disposal installations | 7 | 0.64 |
Rainwater and sanitary intstallations | Ìý | Ìý |
Water installations | 13 | 1.18 |
Low-temperature hot water, chilled water, domestic hot and cold water | Ìý | Ìý |
Space heating and air treatment | 110 | 10 |
Full air-conditioning, gas heating and ventilating installation including central plant, roof units and insulation controls. Chiller equipment. Commissioning | Ìý | Ìý |
Electrical services | 95 | 8.64 |
Mains switchgear and cabling. Power installation, including busbars. Lighting, including display lighting, fire alarm, security installation and lightning protection | Ìý | Ìý |
Lift and conveyor installations | 4.5 | 0.41 |
2 dock levellers, pads and electrically-operated doors | Ìý | Ìý |
Protective installations | 17 | 1.55 |
Single-level sprinkler installation, comprising storage tanks, pumps and pipework | Ìý | Ìý |
Communication installations | 8 | 0.73 |
Sound and telephone installations | Ìý | Ìý |
Builders' work in connection with services | 25 | 22.27 |
Sealing around service penetrations, associated builders' work etc | Ìý | Ìý |
Contractor's fees, site costs* | 67 | 6.09 |
Total | 1100 | 100 |
Car parking, landscaping etc | 15 | 13.6 |
Hard and soft landscaping, including roads, car parking for 400 cars, planting etc at £535 000 | Ìý | Ìý |
Petrol filling station at £200 000 | Ìý | Ìý |
*Excludes design team costs of 8-12% | Ìý | Ìý |