Keep up to dateMarking the benches: Costs of recently built sports halls | |||||||||
Project | Location | Area (m2) | Base date | Contract sum (£) | Actual cost/m2 (£) | Percentage change to accommodate inflation since built (%) | Percentage change to reach south-east England benchmark (%) | Current cost/m2 in south-east England (£) | |
1 | School sports hall | Scarborough, North Yorkshire | 2,286 | Mar-94 | 250,000 | 334 | 53.94 | 19.78 | 615 |
2 | College sports hall | Liverpool | 8,839 | Jan-99 | 1.4m | 527 | 20.53 | 13.54 | 722 |
3 | Gymnasium | St Albans, Herts | 1,829 | Feb-99 | 525,000 | 893 | 23.7 | –3.54 | 1,066 |
4 | High school sports hall | Greater Manchester | 3,048 | Jul-99 | 700,000 | 915 | 18.31 | 14.74 | 1,242 |
5 | Sports and environment centre | Braintree, Essex | 2,286 | Oct-99 | 1.2m | 1,270 | 19.75 | 0.93 | 1,535 |
6 | School sports hall | Near Ashford, Kent | 4,206 | Jan-00 | 1.2m | 743 | 18.72 | –2.68 | 858 |
7 | Sports pavilions* | Basildon, Essex | 2,286 | Jan-00 | 640,000 | 915 | 18.72 | 0.93 | 1,096 |
8 | Secondary school sports hall | New Romney, Kent | 7,010 | Mar-00 | 2.3m | 1,001 | 18.72 | –2.68 | 1,157 |
9 | Residential school sports hall | Merseyside | 2,286 | Jul-00 | 740,000 | 377 | 14.27 | 13.54 | 489 |
10 | Sports hall | Greater Manchester | 2,134 | Sep-01 | 580,000 | 646 | 10.42 | 14.74 | 818 |
11 | Sports hall | Widnes, Greater Manchester | 2,804 | Dec-01 | 780,000 | 775 | 9.84 | 14.74 | 977 |
12 | Sports hall on college campus | North Yorkshire | 4,267 | Mar-03 | 1.1m | 829 | 3.07 | 19.78 | 1,023 |
Average current cost/m2 of south-east England sports hall | 967 | ||||||||
Notes | |||||||||
1 Sports hall only. No changing or shower accommodation (provided elsewhere). Steel framed building with brick cladding. | |||||||||
2 Steel-framed sports hall with brick cladding to lower level, profiled metal cladding and curved aluminium roofing. Sports and changing accommodation on ground floor, bar and fitness suite on first floor. | |||||||||
3 Gymnasium. Steel frame, brick cladding, fair faced block internally. Wood flooring to hall. Showers, changing accommodation, and so on. | |||||||||
4 Steel-framed sports hall with two-storey ancillary accommodation. Brick cladding, profiled metal roofing. | |||||||||
5 Sports and leisure building, main hall plus display space for community use. Changing rooms to provide for people using outside football pitches. Includes energy saving measures, wind turbines, solar panels, and so on. | |||||||||
6 Steel-framed sports hall and changing block. Profiled metal wall and roof cladding over brick dado walls. Granwood flooring to hall. Includes changing accommodation. | |||||||||
7 New sports pavilion providing main hall, changing rooms and showers with ancillary areas, bar, and so on. Steel framed building with brick–block cladding and normal finishes and services installations. | |||||||||
8 Main sports block and changing accommodation. Some teaching accommodation. Facilities designed for dual school use and public community use. | |||||||||
9 Sports hall including lighting and heating, etc, but no changing or toilet facilities. Steel-framed building, brick and profiled metal cladding. | |||||||||
10 Steel-framed sports hall for secondary school. Brick cladding, below profiled metal wall and roof cladding. Includes changing accommodation. | |||||||||
11 Steel-framed sports hall with brick cladding, below profiled metal wall and roof cladding. Sports and changing accommodation only, excludes adaptations to existing buildings. | |||||||||
12 Four-court sports hall and changing rooms on college campus. |
Cost of health and leisure facilities fit-out | |||
Multidisciplinary practice Ridge has produced costs for the fit-out of private and public sector health and leisure facilities based on schemes it has worked on. The unit rate reflects current day figures of building and figures are based on a generic building and are exclusive of external works, loose equipment, professional fees and VAT. | |||
Elements | Private health and fitness fit-out £/m2 | Local authority refurbishment £/m2 | Local authority new build including fit-out £/m2 |
Demolition/alteration works | 70 | ||
Substructures | 15 | 175 | |
Superstructure | 115 | 205 | 510 |
Internal finishes | 150 | 95 | 125 |
Fittings | 135 | 20 | 105 |
Services (including pool) | 670 | 250 | 640 |
Preliminaries | 85 | 100 | 235 |
Total | 1,155 | 755 | 1,790 |