Keep up to dateSpace planning | ||
Ìý | Primary Schools (m2) | Secondary Schools (m2) |
Teaching area/place | 2.5-3.3 | 04-May |
Gross area/place | 04-Jun | 07-Aug |
Costs | ||
Ìý | Cost in £/m2 | Ìý |
Ìý | Range | Average |
Primary schools | 550-750 | 650 |
Secondary schools | 500-750 | 625 |
Ìý | Space/Place (m2) | Cost/Place (m2) |
Primary schools | 04-Jun | 3000-5000 |
Secondary schools | 07-Aug | 4500-7000 |
(Costs exclude futniture and fittings) | Ìý | Ìý |
Costs for 1600m2 Technology block | |||
Ìý | Element cost (£) | £/m2 gfa (£) | % of total cost |
Substructure | 51 200 | 32 | 5.12 |
Stip and pad foundations with dpm, 150mm, 175 mm and 215 mm insitu reinforced concrete power-floated pads and slabs, brick/block cavity walls | Ìý | 1280 m2 @ | £40 |
Frame | 81 400 | 50.88 | 8.14 |
Structural steel circular columns, beams, roof supports and bowstring trusses to single- and two-storey roofs (23.4 kg/m2) | Ìý | 1280 m2 @ | £46.70 |
Glulam softwood tie beams and fixings along and across corridors | Ìý | 508m @ | £37 |
Reinforced concrete columns to first-floor slab | Ìý | 6 m2 @ | £472 |
Upper floors | 16 000 | 10 | 1.6 |
290 mm insitu reinforced concrete power-floated slab supported on reinfored concrete columns | Ìý | 320 m2 @ | £50 |
Roof | 115 000 | 71.87 | 11.5 |
Insulated, colour-coated double-skin metal barrel roof cladding with aluminium outer sheets and galvanised steel inner sheets to clerestory roof | Ìý | 460 m2 @ | £61 |
Insulated, colour-coated double-skin metal roof cladding with aluminium outher sheets and galvanised steel inner sheets to 15° pitch | Ìý | 1007 m2 @ | £62.50 |
Hardrow slates to 40° pitch on timber roof trusses to two-storey block including eaves ventilators | Ìý | 190 m2 (on plan) @ | £52.50 |
Bauder VB4-AL flat roof system to gutters etc | Ìý | 33 m2 @ | £55 |
Powder-coated aluminium-ribbon double-glazed rooflights to 40° pitch on two-storey block | Ìý | 20 m2 @ | £183 |
Powder-coated aluminium rainwater gutters and down pipes | Ìý | 1600 m2 @ | £5.35 |
Stairs | 9 040 | 5.65 | 0.9 |
Precast concrete straight stair flight 1.45m wide x 4.725m going x 2.612 m rise including intermediate landing, beech treads and handrails and ceramic tiles to landings | Ìý | 4 @ | £1,975 |
Galvanised mild steel companion ladder 600 mm wide x 2.625 m rise, including handrail and balustrade | Ìý | 1 @ | £1,140 |
External walls | 41 600 | 26 | 4.16 |
Medium quality handmade facing brick (PC £255/1000) 325 mm cavity wall with 140 mm block inner skin | Ìý | 340 m2 @ | £64 |
Forticrete reconstructed stone-faced 360 mm cavity wall with 140 mm block inner and outer skins | Ìý | 77 m2 @ | £56.50 |
340 mm cavity wall with 100 mm block outer skin with two-coat external cement lime sand rendering, painted with masonry paint and 140 mm block inner skin | Ìý | 146 m2 @ | £45 |
Timber-framed wall comprising softwood studding, 2 mm plywood sheeting and cladding, vapour barrier, 100 mm insulation and 18 x 80 mm Doublas fir weather-boarding, including lead flashings | Ìý | 116 m2 @ | £77 |
Windows and external doors | 109 440 | 68.4 | 10.94 |
Polyester powder-coated single-glazed fixed and opening light galvanised steel windows with 4 mm annealed or 6.5 mm laminated glass in softwood subframes | Ìý | 120 m2 @ | £255 |
Polyester powder-coated single-glazed fixed and opening light galvanised steel windows with 4 mm annealed glass to clerestory lights | Ìý | 148 m2 @ | £217 |
Polyester powder-coated single-glazed galvanised steel fixed light louvred entrance screen with laminated glass | Ìý | 36 m2 @ | £160 |
Polyester powder-coated single-glazed steel entrance screens with double doors and laminated glass | Ìý | 50 m2 @ | £550 |
Window control gear | Ìý | 40 @ | £11,000 |
65 mm framed, ledged and braced door, painted | Ìý | 5 @ | £330 |
44 mm half-glazed flush door, painted | Ìý | 1 @ | £380 |
57 mm panelled louvred door, painted | Ìý | 1 @ | £434 |
Internal walls and partitions | 49 200 | 30.75 | 4.92 |
Polyester powder-coated single-glazed galvanised steel screen with 4 mm annealed glass | Ìý | 15 m2 @ | £145 |
Polyester powder-coated half-hour fire resistant galvanised steel screen or borrowed light with 6.5 mm Pyran glass | Ìý | 66 m2 @ | £290 |
Polyester powder-coated half-hour fire resistant galvanised circular steel window ranging from 900 to 1800 mm diameter, glazed with 6.5 mm Pyran glass | Ìý | 10 m2 @ | £540 |
140 mm concrete block wall including movement joints and lintels | Ìý | 745 m2 @ | £12.50 |
140 mm fair-faced Forticrete solid reconstructured stone block wall including movement joints and lintels | Ìý | 75 m2 @ | £33 |
Proprietary WC cubicles | Ìý | 5 @ | £440 |
Sundry head restraints, isolated screens etc. | Ìý | £ | £8,500 |
Internal doors | 46 800 | 29.25 | 4.68 |
Plastic laminated flush doors, including ironmongery and painting: | Ìý | 2 500 m2 @ | £14 |
half-hour fire resistant, in softwood frame | Ìý | 20 single @ | £500 |
Ìý | Ìý | 5 pairs @ | £1,000 |
one-hour fire resistant, in hardwood frame | Ìý | 4 single @ | £600 |
Ìý | Ìý | Ìý | Ìý |
half-hour fire resistant with vision panel, in softwood frame | Ìý | 8 single @ | £625 |
Ìý | Ìý | 6 pairs @ | £1,200 |
Plastic laminated flush sliding door in lining | Ìý | 4 @ | £1,225 |
Zinc-coated steel rotary dark room door | Ìý | 1 @ | £1,100 |
Polyester powder-coated galvanised steel single-glazed half-hour fire resistant doors and associated screens, including ironmongery | Ìý | 32 m2 @ | £350 |
Wall finishes | 22 400 | 14 | 2.24 |
13 mm gypsum plaster finish on cement lime sand undercoat to walls, including one mist and two coats of emulsion paint | Ìý | 2167 m2 @ | £7.10 |
12.5 mm wallboard and skim coat including one mist and two coats of emlsion paint | Ìý | 82 m2 @ | £10.50 |
152 x 152 x 5.5 mm ceramic wall tiles on backing | Ìý | £278 m2 @ | £21 |
One mist and two coats of emulsion paint on fair-faced blockwork | Ìý | 54 m2 @ | £2 |
Two coats of masonry paint on fiar-faced blockwork | Ìý | 30 m2 @ | £7 |
Floor finishes | 26 800 | 16.75 | 2.68 |
2 mm vinyl sheet coverings and skirting on power-floated concrete finish | Ìý | 896 m2 @ | £15.25 |
152 x 152 x 12.5 mm ceramic tiles and skirtings on and including screed | Ìý | 156 m2 @ | £39 |
Heuga Vortex 625 carpet tiles glued on power-floated concrete finish | Ìý | 267 m2 @ | £10 |
25 x 69 mm softwood painted skirtings | Ìý | 145 m @ | £2.75 |
Sundry screeds to slope floor coverings and edge trims etc | Ìý | 315 m2 @ | £2 150 |
Two coats of Sikafloor 65 floor paint on concrete | Ìý | 189 m2 @ | £7.50 |
Entrance matting | Ìý | 13 m2 @ | £32 |
Ceiling finishes | 9 120 | 5.7 | 0.91 |
9.5 mm plasterboard and skim coat to ceilings, including one mist and two coats of emulsion paint | Ìý | 372 m2 @ | £9 |
13 mm gypsum plaster finish on cement lime sand undercoat to ceilings including one mist and two coats of emulsion paint | Ìý | 176 m2 @ | £7.20 |
12.5 mm wallboard and skim coat to ceilings, including one mist and two coats of emulsion paint | Ìý | 21 m2 @ | £8.20 |
Sundry timber framing | Ìý | Item @ | £1 000 |
Cement lime and sand rendering on insulated metal lathing to external concrete soffit, including two coats of masonry paint | Ìý | 68 m2 @ | £49 |
Fittings and furnishings | 48 000 | Ìý | Ìý |
Fixed worktops, benches and equipment | Ìý | Ìý | Ìý |
Sundry fittings and fixtures, including shelving, storage racking, cupboards etc | Ìý | Ìý | Ìý |
Sanitary appliances | 16 000 | Ìý | Ìý |
2 cleaners' sinks, 11 basins, 20 sinks, 10 WC suites, 5 underbench sinks and 1 urinal, fountain and sundry other items | Ìý | Ìý | Ìý |
Disposal installations | 6 160 | Ìý | Ìý |
PVCu above ground drainage and laboratory waste and vent pipework | Ìý | Ìý | Ìý |
Water installations | 16 000 | Ìý | Ìý |
Hot and cold water installation in copper with cold water storage tanks | Ìý | Ìý | Ìý |
Space heating and air treatment | 84 800 | Ìý | Ìý |
Low temperature hot water modulated heatnig circuit serving high-level radiant panels and radiators in ancilary areas fed from plant room roof over the first floor | Ìý | Ìý | Ìý |
Local extract ventilation system, fume and dust extract systems and fans from equipment | Ìý | Ìý | Ìý |
Air-conditioning plant to computer room | Ìý | Ìý | Ìý |
Heat source | 38 565 | Ìý | Ìý |
Gas fired boilers with pumps, pressure gauges, and boiler flue system | Ìý | Ìý | Ìý |
Electrical installation | 91 200 | Ìý | Ìý |
Main switchboard, mains and sub-mains distribution, cable trays and conduits for all systems | Ìý | Ìý | Ìý |
Lighting installation | Ìý | Ìý | Ìý |
Emergency lighting | Ìý | Ìý | Ìý |
Small power and wiring to specialist equipment | Ìý | Ìý | Ìý |
Earthing and bonding | Ìý | Ìý | Ìý |
Gas installation | 11 600 | Ìý | Ìý |
Gas supplies to benches and equipment | Ìý | Ìý | Ìý |
Protective installations | 1 600 | Ìý | Ìý |
Security alarm | Ìý | Ìý | Ìý |
Communications installations | 27 600 | Ìý | Ìý |
Fire alarm | Ìý | Ìý | Ìý |
Telephone wiring | Ìý | Ìý | Ìý |
Data cabling | Ìý | Ìý | Ìý |
Builder's work for services | 15 475 | Ìý | Ìý |
Associated holes, sleeves, plant bases etc | Ìý | Ìý | Ìý |
SUB TOTAL | 935 000 | Ìý | Ìý |
PRELIMINARIES | Ìý | Ìý | Ìý |
Contractor's management and staff, site accommodation and other preliminary items - allow 7%, say | 65 000 | Ìý | Ìý |
TOTAL | 1 000 000 | Ìý | Ìý |
OTHER BUILDINGS ON SAME SITE (INCLUDING PRELIMINARIES) | Ìý | Ìý | Ìý |
4300 m2 two-storey main teaching block | 2 666 000 | Ìý | Ìý |
1280 m2 one-storey science block | 868 000 | Ìý | Ìý |
1400 m2 one/two-storey music and drama block | 1 043 000 | Ìý | Ìý |
1760 m2 one-storey sports hall block | 1 223 000 | Ìý | Ìý |
BUIILDING TOTAL | 6 800 000 | Ìý | Ìý |
EXTERNAL WORKS* | 1 534 000 | Ìý | Ìý |
(all qualifying for additional costs and including preliminaries, adjusted for a typical site - say @ 22.5%. External works for a 3 ha site, including site preparation, roads, car parks, paved areas, site fencing and boundary walls, landscaping, planting and site furniture - Allow £930 000 | Ìý | Ìý | Ìý |
Drainage - allow £224 000 | Ìý | Ìý | Ìý |
External services - allow £380 000 | Ìý | Ìý | Ìý |
OVERALL CONSTRUCTION COST | 8 334 000 | Ìý | Ìý |
*External works costs exclude the abnormal costs of approximately £325 000 for playing fields for a new school on a greenfield site. | Ìý | Ìý | Ìý |
Alternative teaching area costs | ||
Area | Comparative £/m2 rate | Cost factor |
General classrooms | 580 | 1 |
Humanities (generally) | 582 | 1 |
History/Geography | 640 | 1.1 |
Mathematics | 610 | 1.05 |
Languages | 610 | 1.05 |
Music and Drama | 755 | 1.3 |
Sciences | 690 | 1.19 |
Home Economics | 670 | 1.15 |
Design & Technology | 630 | 1.09 |
Sports hall | 700 | 1.21 |
Regional factors | |
Region | Factor |
Inner London | 1.09 |
Outer London | 1.05 |
East Anglia | 0.96 |
East Midlands | 0.93 |
Northern | 0.96 |
Northern Ireland | 0.81 |
North West | 0.98 |
Scotland | 1.04 |
South East | 1 |
South West | 0.93 |
Wales | 0.94 |
West Midlands | 0.94 |
Yorkshire and Humberside | 0.95 |