Project will see demolition of 1980s offices and revamp of grade II-listed City Temple
Eric Parry Architects has won planning permission to demolish a 1980s office building in the City of London and replace it with a 10-storey hotel.
The project to redevelop TP Bennett鈥檚 Morley House, on Holborn Viaduct, will also include the refurbishment of the neighbouring grade II City Temple, a church designed by Lockwood and Mawson. Planners described the proposal as a way of securing the long-term future of what is sometimes referred to as the non-conformists鈥 cathedral.
The scheme has been worked up for Shiva Hotels, which is the developer behind Parry鈥檚 proposals to redevelop the Brutalist Wigmore Street car park off Oxford Street.
Parry鈥檚 designs for the current nine-strorey Morley House, will see it replaced with a 10-storey, 191-room hotel. The building would be predominantly stone-faced towards Holborn Viaduct, where it would be bookended by the grade II-listed South West Pavilion and City Temple.
As part of the project, Morley House鈥檚 owners will fund refurbishment work on City Temple 鈥 costed in 2015 at 拢2.5m 鈥 in return for a long lease on the church building鈥檚 two basement levels, which would be used as offices.
Although the grade II-listed building will retain its 1870s Victorian frontage, most of the structure dates from the 1950s after extensive reconstruction following Second World War bomb damage
Under the proposals, the current building鈥檚 ground floor and upper levels would remain in church use, but the entrance foyer would be refurbished, and the ground-floor sanctuary and meeting rooms would be remodelled.
Work would also include the removal of the worship area鈥檚 raked first-floor gallery for replacement with two new mezzanine floors for conference use.
Recommending the connected schemes for approval, City of London planners said the proposed change of use of Morley House was considered acceptable, despite a net loss of office space, while they noted the church supported the City Temple proposals.
鈥淭he new hotel is acceptable in terms of its design, impact on adjacent listed buildings, impact on views and impact on daylight and sunlight levels to a nearby residential dwelling,鈥 they said.
鈥淪ufficient information has been provided to demonstrate that the development would function operationally in terms of its impact on the surrounding highways, delivery and servicing and refuse collection.鈥
They added that the 鈥漰hysical works to the listed building in association with the provision of the office space would not detract from its architectural or historic significance.
鈥淭he scheme provides the opportunity to secure the long-term future of City Temple.鈥
The wider project team includes Beadmans as project manager and quantity surveyor, Fairhurst GGA as structural engineer and Hilson Moran as building services engineer.
No comments yet