Percentage increases in capital costs*
ÌýBREEAM score (and rating) for the base case % increase for pass% increase for good% increase for very good% increase for excellent
LocationÌý ÌýÌýÌý
Poor location 25.4 (pass) 0% 0% 2% –
Typical location 39.7 (pass) –0% 0% 3.4%
Good location 42.2 (good) ––0% 2.5%
* A small overall cost saving was identified resulting from the removal of air-conditioning equipment in the computer/server room thereby enabling increased performance at no extra cost