Keep up to datePercentage increases in capital costs* | |||||
Ìý | BREEAM score (and rating) for the base case | % increase for pass | % increase for good | % increase for very good | % increase for excellent |
Location | Ìý | Ìý | Ìý | Ìý | |
Poor location | 25.4 (pass) | 0% | 0% | 2% | – |
Typical location | 39.7 (pass) | – | 0% | 0% | 3.4% |
Good location | 42.2 (good) | – | – | 0% | 2.5% |
* A small overall cost saving was identified resulting from the removal of air-conditioning equipment in the computer/server room thereby enabling increased performance at no extra cost |