- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÚ¶´ÉçÇø the Future
- Data
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to date
- ºÚ¶´ÉçÇø Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÚ¶´ÉçÇø Awards
Keep up to dateIndicative build costs (£/m2) | ||
Out-of-town | Urban | |
Shell construction | 320-600 | 600-800 |
Fit-out | 550-650 | 550-650 |
Indicative costs are current at the second quarter of 2000, based on an outer London location. Operator’s supplies and equipment are excluded. Demolition, external works and services, professional fees and VAT are also not included. |
Shell construction - multiplex development | |||
element cost £ | Cost/m2 gfa £ | % of total cost | |
Substructure | 700 000 | 88.05 | 14.17 |
Ground slab; 200 mm-thick reinforced insitu concrete bed, hardcore; damp-proof membrane; ground beams | 4000 m2 | @ £90 | |
Extra for piling and pile caps | 4000 m2 | @ £65 | |
Allowance for below-ground drainage, including connections to existing infrastructure | 4000 m2 | @ £20 | |
Frame | 759 000 | 95.47 | 15.36 |
Structural steel framing; allowance based on 80 kg/m2; (average rate for universal sections) | 595 t | @ £950 | |
Extra for roof trusses | 190 t | @ £225 | |
Structural steel frame to cinema mezzanine | 40 t | @ £950 | |
Fire protection; rigid-board fire protection; one-hour fire resistance to columns and first-floor beams only | 4400 m2 | @ £20 | |
Additional fire-protection measures | Item | @ £10 000 | |
Allowance for roof-level plant platform in structural steel; including acoustic isolation | Item | @ £15 000 | |
Upper floors | 189 000 | 23.77 | 3.82 |
Composite floor slabs; 150 mm insitu concrete on metal decking; kerbs | 4200 m2 | @ £45 | |
Roof | 475 800 | 59.85 | 9.63 |
Composite roof slab; 200 mm-thick insitu concrete on metal decking; upstands and edge beams | 1000 m2 | @ £75 | |
Roof cladding; profiled metal deck; on purlins at 1.2 m centres | 3150 m2 | @ £16 | |
Mastic asphalt, insulation, vapour barrier; paving slabs | 700 m2 | @ £53 | |
PVC single-ply membrane; insulation; vapour barrier; plywood base | 3150 m2 | @ £75 | |
Extra for additional acoustic treatment to roofing above auditoria | 2600 m2 | @ £20 | |
Allowance for access platforms and safety barriers | Item | @ £25 000 | |
Stairs | 153 600 | 19.32 | 3.11 |
Main entrance feature stair; steel with glass balustrades and stainless steel handrails; finishes | Item | @ £50 000 | |
Escape stairs; precast concrete stairs and half landings; polyester powder-coated steel handrails; finishes | 52 m | @ £1750 | |
Plant access stairs; precast concrete stairs and half landings; polyester powder-coated steel handrails; finishes | 9 m | @ £1400 | |
element cost £ | Cost/m | % of total cost | |
External walls | 754 100 | 94.86 | 15.26 |
Architectural masonry; cavity-wall construction; windbracing, ties, insulation, movement joints; copings | 2900 m2 | @ £120 | |
Curtain walling; framed double-glazed units; colour-coated aluminium framing; flashings; accessories | 440 m2 | @ £330 | |
Extra for glazed entrance screen; two fully glazed double doorsets; ironmongery and accessories | 30 m2 | @ £300 | |
Metal wall cladding; colour-coated aluminium; flush composite panels; flashings; accessories; blockwork backing wall | 800 m2 | @ £230 | |
Blockwork; party-wall construction; ties, insulation, movement joints | 1140 m2 | @ £55 | |
Temporary shopfronts | 260 m2 | @ £20 | |
Windows and external doors | 43 800 | 5.51 | 0.89 |
Windows; steel-framed with sealed double-glazed units; polyester powder coating | 60 m2 | @ £270 | |
Fire-escape and goods-access doors; colour-coated steel doors and frames; ironmongery; accessories | 29 | @ £950 | |
Internal walls and partitions | 246,800 | 31.04 | 4.99 |
Insitu concrete walls; 150 mm average thickness | 1200 m2 | @ £75 | |
Blockwork partitions; 140 mm average thickness; head restraint; to stairs and service risers only | 3920 m2 | @ £40 | |
Internal doors | 42 000 | 5.28 | 0.85 |
Acoustic doors; fire-rated; steel-faced doors with insulated cores; steel goalpost frames; ironmongery; complete | 17 | @ £1050 | |
Flush doors; fire-rated; solid-core ply-faced; hardwood frames; ironmongery; complete | 14 | @ £600 | |
Flush doors; non-fire-rated; solid-core ply-faced; hardwood frames; ironmongery; complete | 12 | @ £480 | |
Allowance for services access panels | Item | @ £10 000 | |
Wall finishes | 7 800 | 0.98 | 0.16 |
Two coats emulsion paint; to blockwork/plasterboard | 2600 m2 | @ £3 | |
Floor finishes | 32 500 | 4.09 | 0.66 |
Cement-sand screed; average thickness 60 mm | 2,500 m2 | @ £11 | |
Mats and matwells | Item | @ £5 000 | |
Ceiling finishes | 7 700 | 0.97 | 0.16 |
Self-finished insulation board; to exposed soffit in goods yard | 240 m2 | @ £32 | |
Fittings and furnishings | 50 000 | 6.29 | 1.01 |
Allowance for external signage | Item | @ £50 000 | |
element cost £ | cost/m2 gfa | % of total cost | |
Disposal installations | 31 800 | 4 | 0.64 |
Rainwater disposal; cast-iron downpipes and fittings; connections to below-ground drainage | 7950 m2 | @ £4 | |
Water installations | 10 500 | 1.32 | 0.21 |
Capped-off connections to retail shells and cinema unit; flowmeters | 7 | @ £1500 | |
Space heating and air treatment | 10 000 | 1.26 | 0.2 |
Local electrical heating to lift motor rooms | Item | @ £5000 | |
Local ventilation to lift motor rooms | Item | @ £5000 | |
Electrical installations | 200 800 | 25.26 | 4.06 |
Mains and sub-mains installation | 7950 m2 | @ £10 | |
Small power distribution; landlord’s areas only | 710 m2 | @ £10 | |
Lighting and luminaires; landlord’s areas only | 710 m2 | @ £15 | |
Emergency lighting installation; landlord’s areas only | 710 m2 | @ £5 | |
Entrance and external feature lighting | Item | @ £100 000 | |
Lift installations | 286 000 | 35.97 | 5.79 |
Four-person, electro-hydraulic lift serving two floors; 0.6 m/s | Item | @ £38 000 | |
Electro-hydraulic goods lifts serving two floors; 1500 kg | 2 | @ £54 000 | |
Escalators; 800 mm wide; total rise 5 m | 2 | @ £70 000 | |
Protective installations | 30 900 | 3.89 | 0.63 |
Lightning protection | 7950 m2 | @ £1.50 | |
Earthing and bonding | 7950 m2 | @ £1.50 | |
Dry-riser installation | Item | @ £7000 | |
Communications installations | 169 000 | 21.26 | 3.42 |
Fully addressable fire, smoke-detection and alarm system | 7950 m2 | @ £7 | |
Public address system | 7950 m2 | @ £6 | |
Allowance for security, CCTV and access control | 7950 m2 | @ £7.50 | |
Wireways for telephones and data | Item | @ £6 000 | |
Builder’s work in connection | 22 000 | 2.77 | 0.45 |
Forming holes, chases etc; allow 3% | Item | @ £22 000 | |
Preliminaries and contingencies | 718 000 | 90.31 | 14.53 |
Contractor’s overheads, site establishment and site supervision; allow 12% | Item | @ £507 000 | |
Contingency sum; allow 5% | Item | @ £211 000 | |
Total construction cost – shell only | 4 941 100 | 621.52 | 100 |
Fit out - cinema only  | |||
element cost £ | cost/m2 gfa | % of total cost | |
Upper floors | 405 700 | 104.03 | 15.51 |
Sloping floor construction to cinemas; floating acoustic double-slab construction;insitu concrete, permanent formwork, isolation pads. | 1300 m2 | @ £35 | |
Extra for ramped slab up to 1 m total rise; fire-rated polystyrene infill, insitu concrete dwarf wall to front edge | 580 m2 | @ £40 | |
Stadium seat tiers; precast concrete planks; isolation pads; steel trusses; including fire protection | 940 m2 | @ £300 | |
Allowance for forming ramps and intermediate steps | Item | @ £10 000 | |
Extra for additional insulation treatment to suspended slabs | 2250 m2 | @ £20 | |
Internal walls and partitions | 297 100 | 76.18 | 11.35 |
Metal stud partition; two layers wallboard both sides; insulation | 1020 m2 | @ £38 | |
Acoustic partition; 450 mm thick; auditorium to foyer; double-stud construction with two layers plasterboard each side; insulation | 800 m2 | @ £60 | |
Acoustic partition; 300 mm thick; auditorium to mezzanine/store; double-stud construction with two layers plasterboard each side; insulation | 1700 m2 | @ £45 | |
Acoustic partition; 500 mm thick; auditorium to auditorium; contractor-designed to meet acoustic performance | 950 m2 | @ £115 | |
Allowance for shaftwall construction for hoist enclosures | Item | @ £3000 | |
Allowance for freestanding screens to auditoria and WC entrances | Item | @ £10 000 | |
Toilet cubicles | 9 | @ £450 | |
Melamine-faced solid laminate access panelling to WCs etc | 23 | @ £110 | |
Allowance for additional partitions to administration areas | Item | @ £5 000 | |
Internal doors | 31 000 | 7.95 | 1.18 |
Acoustic doors; fire-rated; steel-faced with insulated cores; steel goalpost frames; ironmongery; complete | 12 | @ £1050 | |
Flush doors; fire-rated; solid-core ply-faced; hardwood frames; ironmongery; complete | 10 | @ £600 | |
Flush doors; non-fire-rated; solid-core ply-faced; hardwood frames; ironmongery; complete | 5 | @ £480 | |
Security shutters; to concession unit entrances; including allowance for sub-frame | Item | @ £10 000 | |
element cost £ | cost/m2 gfa | % of total cost | |
Wall finishes | 192 300 | 49.31 | 7.35 |
13 mm two-coat plaster to blockwork | 400 m2 | @ £8 | |
Feature plaster finish to entrance lobby | 100 m2 | @ £100 | |
Acoustic lining; to inner face of external walls; two layers wallboard and insulation on metal studs | 1100 m2 | @ £20 | |
Acoustic lining to screen and back walls of auditoria | 1450 m2 | @ £19 | |
Acoustic lining to auditorium side walls; fabric covering | 1950 m2 | @ £43 | |
Vinyl wall finish to plaster/plasterboard generally; in public areas | 3100 m2 | @ £9 | |
Two coats emulsion paint; to plaster/plasterboard generally | 3600 m2 | @ £3 | |
Ceramic tiling | 200 m2 | @ £35 | |
Floor finishes | 123 400 | 31.64 | 4.72 |
Ceramic floor tiling; to screed | 715 m2 | @ £45 | |
Vinyl sheet flooring; to screed; to part auditoria | 715 m2 | @ £20 | |
Vinyl sheet flooring; to screed; to back-of-house areas | 600 m2 | @ £15 | |
Carpet; on underlay; to screed; to circulation, part auditoria and office spaces | 1010 m2 | @ £27 | |
Allowance for enhanced foyer finishes | Item | @ £10 000 | |
Ceiling finishes | 188 200 | 48.26 | 7.19 |
Acoustic suspended ceiling on anti-vibration mountings | 2250 m2 | @ £45 | |
Suspended ceiling to auditoria | 2250 m2 | @ £25 | |
Suspended ceiling to foyer and circulation areas | 1000 m2 | @ £20 | |
Extra for moisture-resistant suspended ceiling to WCs | 110 m2 | @ £5 | |
Suspended ceiling to back-of-house areas | 675 m2 | @ £15 | |
Fittings and furnishings | 31 000 | 7.95 | 1.19 |
Allowance for handrails to auditoria | Item | @ £6000 | |
Allowance for additional joinery | Item | @ £10 000 | |
Allowance for internal signage | Item | @ £5000 | |
Allowance for fixing tenant's supply-only fixtures and fittings | Item | @ £10 000 | |
Sanitary fittings | 9 100 | 2.33 | 0.35 |
WCs, urinals, wash-hand basins; generally | 23 | @ £350 | |
Allowance for fittings for disabled WCs | Item | @ £1000 | |
Disposal installations | 9 200 | 2.36 | 0.35 |
Soil, waste and vent system; above-ground internal pipework, cast iron and uPVC | 23 | @ £400 | |
element cost £ | cost/m2 gfa | % of total cost | |
Water installations | 28 200 | 7.23 | 1.08 |
Hot and cold water service; direct mains supply; local water heaters; distribution (average rate used) | 33 | @ £400 | |
Hot and cold water service; allowance for supplies to concession units | Item | @ £15 000 | |
Space heating and air treatment | 457 000 | 117.18 | 17.47 |
Supply and extract ventilation; direct gas-fired air-handling plant; ductwork; dampers and insulation | 3220 m2 | @ £75 | |
Chilled water plant; DX system serving air-handling plant; distribution; insulation | 3220 m2 | @ £25 | |
Localised comfort cooling to back-of-house areas; package split heating/cooling units; distribution; insulation; blower units; local controls | 13 | @ £5000 | |
Toilet ventilation | Item | @ £50 000 | |
Dedicated extract installations; to projectors, concession areas and ancillary spaces | Item | @ £20 000 | |
Electrical installations | 234 400 | 60.1 | 8.96 |
Lighting and luminaires to general office and ancillary areas | 680 m2 | @ £15 | |
Lighting and luminaires to auditoria; including separate circuits for house lights and cleaner’s lights | 2250 m2 | @ £30 | |
Lighting and luminaires to lobby and public spaces | 970 m2 | @ £20 | |
Emergency lighting | 3900 m2 | @ £5 | |
General power | 3900 m2 | @ £10 | |
Extra for clean power supply to back-of-house areas | 680 m2 | @ £10 | |
Power supply to HVAC plant and lifts | Item | @ £20 000 | |
Standby generator; supply to life-safety installations only | Item | @ £50 000 | |
Earthing and bonding | 3900 m2 | @ £0.50 | |
Gas installation | 10 000 | 2.56 | 0.38 |
Gas installation | Item | @ £10 000 | |
Communications installations | 110 500 | 28.33 | 4.22 |
Fully addressable fire, smoke-detection and alarm system; secondary distribution and detectors; integration with PA system for phased evacuation using voice alarm | 3900 m2 | @ £10 | |
Public address system; distribution and sounders | 3900 m2 | @ £5 | |
Security, CCTV and access control | Item | @ £50 000 | |
Disabled alarm installation | Item | @ £2 000 | |
element cost £ | cost/m2 gfa | % of total cost | |
Special installations | 81 000 | 20.77 | 3.1 |
ºÚ¶´ÉçÇø management system | 3900 m2 | @ £15 | |
Allowance for sound and control system wiring to auditoria | 2250 m2 | @ £10 | |
Builder’s work in connection | 28 000 | 7.18 | 1.07 |
Forming holes, chases etc; allow 3% | Item | @ £28 000 | |
Preliminaries and contingencies | 380 000 | 97.44 | 14.53 |
Contractor’s overheads, site establishment and site supervision; allow 12% | Item | @ £268 000 | |
Contingency sum; allow 5% | Item | @ £112 000 | |
Total construction cost – fit-out | 2 616 100 | 670.8 | 100 |
Regional variations | |
All costs in this article are based on schemes located in outer London and should be adjusted by the following location factors for projects in other areas. | |
Inner London | 1.06 |
South-east | 0.95 |
South-west | 0.89 |
East Midlands | 0.87 |
West Midlands | 0.87 |
East Anglia | 0.89 |
Yorkshire and Humberside | 0.86 |
North-west | 0.89 |
North | 0.87 |
Scotland | 0.90 |
Wales | 0.86 |
Site powered by