Keep up to dateElemental cost analysis for phases one and two, and estimated costs of full laboratory fit-out | ||||
Construction summary | (costs adjusted for inflation) | Ìý | ||
gfa 5,826 m2 | elemental cost | cost/m2 gfa | % split | notes |
Substructure | 893,000 | 193 | 7.27% | continuous-flight auger-piled foundations |
Frame | 708,000 | 153 | 5.77% | insitu reinforced concrete |
Upper floors | 712,000 | 154 | 5.80% | flat reinforced concrete slabs 300 mm thick |
Roof | 442,000 | 95 | 3.60% | terne-coated stainless steel |
Stairs | 111,000 | 24 | 0.90% | architectural metalwork |
External walls | 1,105,000 | 238 | 9.00% | anodised aluminium curtain walling |
Windows and external doors | 74,000 | 16 | 0.60% | double-glazed anodised aluminium |
Internal walls and partitions | 688,000 | 148 | 5.60% | drylined full-height studwork, glazed partitions |
Internal doors | 160,000 | 34 | 1.30% | laminate-faced and veneered solid-core doors |
Wall finishes | 74,000 | 16 | 0.60% | skim plaster and emulsion paint |
Floor finishes | 221,000 | 48 | 1.80% | vinyl sheet, carpeted offices, slate reception |
Ceiling finishes | 172,000 | 37 | 1.40% | perforated metal ceiling tiles, plasterboard perimeters |
Fittings and furnishings | 553,000 | 119 | 4.50% | lab furniture by Byrum |
Sanitary appliances | 37,000 | 8 | 0.30% | Ìý |
Mechanical installation | 3,777,000 | 815 | 30.76% | VAV extract system with some comfort cooling |
Electrical installations | 1,075,000 | 232 | 8.75% | power and data to all desks, laboratory benches |
Site works | 181,000 | 39 | 1.47% | new chemistry square in hard paving with soft landscaping |
Drainage | 23,000 | 5 | 0.19% | below ground drainage complete with interceptors |
External services | 60,000 | 13 | 0.49% | new substation and chemical/solvent stores |
Preliminaries | 1,216,000 | 262 | 9.90% | Ìý |
Total building costs | 12,279,000 | 2,649 | 100.00% | Ìý |